My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE35401
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE35401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:44:58 PM
Creation date
11/21/2007 2:36:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
Enforcement
Doc Date
3/12/1982
Doc Name
JUSTIFICATION FOR PROPOSED AMOUNT OF CIVIL PENALTY FOR NOV 82-7
From
MLRD
To
TRINIDAD BASIN MINING INC C-048-81 ENFORCEMENT ACTION
Violation No.
CV1982007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ • • <br />File No. C-048-81 -2- March 12, 1982 <br />2. Duration and Extent <br />The duration during which the buffer zone was not maintained was <br />approximately two months, or medium duration. The value assigned for <br />duration is two (2). <br />The extent in area over which the violation occurred was small <br />compared to the totality of the operation. R valve of two (2) has been <br />assigned. <br />Probability of damage occurrence - 4 <br />Duration - 2 <br />Extent - 2 <br />Product - I6 <br />Dividing 16 by 64 (the maximum multiple value) yields 0.25. <br />This is multiplied by 51,750.00 (the total maximum penalty for seriousness) <br />to yield $437.50. <br />Seriousness Total S 437.50 <br />C. Fault <br />The operator had been repeatedly warned that the Division was particularly <br />concerned with the adequate salvaging and protection of topsoil resources <br />at this site. The Division feels that the violation was not the result of <br />a greater degree of fault than negligence, but was due to negligence. <br />However, due to the repeated cautions given the operator, the Division feels <br />compelled to assess the largest amount for negligence, 5750.00. <br />Fault Total: $ 750.00 <br />Sum of Assessments <br />History: $ 100.00 <br />Seriousness: $ 437.50 <br />Fault: S 750.00 <br />$1,287.50 <br />The Division proposes the amount of civil penalty for NOV 82-7 at $1,300.00. <br />/mt <br />
The URL can be used to link to this page
Your browser does not support the video tag.