Laserfiche WebLink
iii iii-ii-iiii-i-ii <br />To: Assessment o <br />From: Janet Bin s <br />Re: Foidel Cree me, CV-2001-056 <br />NOV CV-2001-004 was issued to Twentymile Coal Company's Foidel Creek Mine operation for failure <br />to conduct water sampling according to their approved plan. <br />This deviation from the approved water monitoring was appazent after the review of the 2000 Annual <br />Hydrology Report. The Division had discussions back and forth with the operator. The operator <br />collected samples on a Quarterly basis, which is not what was required. The required sampling was 4 <br />"Quarterly pazameter list" sampling between Mazch and September. This schedule was agreed on by the <br />operator and [he Division to provide better data coverage during the time period of high water flow and <br />irrigation season. Also the operator had expressed concern about sampling in the winter months. Data <br />was supposed to be submitted to the Division quarterly but was not. Also a ground water well was <br />recorded as having a broken hydrant. This was not repaired in the entire 12 months the AHR covered. <br />Nor has it been repaired 6 months afer the end of the 2000 water yeaz. <br />After discussion the operator submitted additional water quality data that they had collected for internal <br />monitoring and water management. After review of the additional data the Division determined that the <br />water sampling was still insufficient. NOV CV-2001-004 was issued. <br />