Laserfiche WebLink
PAGE TWO <br />MARCH 23, 1994 <br />BARBARA PAVLIK <br />1. Alluvial well area <br />2. Overland conveyor system <br />3. Topsoil pile near D-portal <br />4. Subsoil pile near D-Portal <br />5. Transfer station <br />6. Northern topsoil pile in RR loop <br />7. Staging areas (near slot and conveyor) <br />S. Staging area near TS-1 <br />Please review the enclosed documents. If DMG finds them acceptable, we will formally submit them <br />as an addendum to T.R. 34 or as a separate T.R., if necessary. <br />Sincerely, <br />Murari P. Shrestha, P.E. <br />Assistant Manager of Engineering <br />MS:Igp <br />cc: Raja Upadhyay <br />Jeff Dubbert <br />Tim Chervick <br /> <br />