Laserfiche WebLink
¢~`~~ %~ LT. S. DEPT. OF THE INTERIGR <br />`~;~ ~~} o, GFFICE OF ~LjP.F At;E 1~-~1^.1NG <br />Mine Site Evaluation <br />~ '~ SEP 2 7 ~~,~te Program <br />~, ~y. j ~ o <br />°~ 2i <br />cFOFSURFACE ~~ <br />I. Permittee/Person 9. Permit Number 10. Permit Typz <br />BASIN RESOURCES, INC. er s 8 Geology C-013-81 PP <br />2. Address 1 1. Field Visit Date f?. Purpose t3. SRA Present <br />3800 COUNTY ROAD 63.9 09/22/2000 CCF a <br />3. City 4. Slate mm - dd -yyyy <br /> l4. Permit Status I5. Site States 16. Facility Tvpe <br />Trinidad CO <br />PI <br />5. Zip Code 6. Phone Number <br />I7. OSM Office # <br />l8. CCID # 19. Land Code <br />81082 {719) 846.2427 <br />140 <br />CC93-020-003 • SF <br />7. Operator Name, if Different than Petmittee <br />C <br />N <br /> 20. iv1.S.H.A ID # 21. Stat ounty <br />ame <br />e Abrev. 22. <br /> 02820 <br />OS CO LAS <br />Mi - <br /> ne Name <br />8. <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />'~ <br />GOLDEN EAGLE ~ <br />103972 f <br />~I <br />L~J <br />25. Hours 26. Si~ tore Block 27. Reviewing Official: <br />8.0 a. Permit Review ~~ <br />(~~ <br /> <br />6 <br />0 <br />b. Site Visit Time Si tore: _ <br />Signature: <br />. HENRY AUSTIN ID # 116 <br /> 6 <br />10.0 c. Travel Tinte <br />Printed Name: <br />Lt~i <br />( <br />/~d / 00 <br />Review Date: ~ 9 /2 <br /> p <br />l mm - dd -yyyy <br /> 2,p d. Report Writing Date: 09/26/2000 ` Is Supplemental MSE Page Used Y/N Y~ <br />Permit Type -Item 10 IP =interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR... Citizen Complaint Referral (non site visit) <br />Oxx... Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Ac~ons CCF.... Gtizen Complain[ Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB.... Abandoned: All surface and underground coal mining activitles have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 640.11(8) <br />ppermitted but not yet disturbed. AB1.. Bond Forfeiture: Bond forteiture officially in process or completed, and. <br />IN....Inactive (Permanent Program Permit): Phase II completed or reclamaliort in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclarmed Forfeiture: Forfeited site where all bonds have been <br />Coal mining wmpleted and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... BOnd Release: Reclamation completed and State Regulatory A83.. Reclaimed Forfeiture: Foreited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bontl (Phase tll Release.) NA...Not Applicable: When site is unpermitted. <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND.. No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Fodeiture Pending The RA is pursuing <br />operations have been staved. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX.. COaI Exploration: Coal exploration operations TC..Temporary Cessatlon: The RA has grantetl performance bond(s), and/or reclama- <br />have started and where coal mining operations cessanon of mining pursuant to 30 CFR 816/ lion of forteited Site is in progress. <br />have not begun. 617.131 b). FR..Forfeited and Reclaimed: Forfeiture <br />AP.. Active Coal Producing: Coal surface mining P1...Phase I elease: At feast Phase I bond release reclamation completed. <br />activities are occurring. granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that <br />qN.. Active Non-Producing: Active non-producing permits. partial bond release. is permitted but there is no bond. <br />facilitytv such as tipple or pre oration plant. P2.. Phase II Release: At least Phase II bond release WC.1N~Idrat: Coal mining and reclamation <br />NM..No td'ining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no suface coal P3.. ?hose III Release: Reclamation completed and the activity is not covered by the <br />Facility Type Codes -Item 16 p,,,gnullary (Haulroad, Conveyor, and/or Rails) H...Exploration Permits L... Remining site ppermitted <br />A... Surface E... Refuse and/or Impountlment I... Nonce of Intent to Explore under 30 CFR765.26 <br />0... Underground F... Loading Facility and/or Tipple J... Exempt 16 and 2/3 <br />C... Preparation Plant G... Stockpiles K...Govemment Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agnculture Regulmory Enforcement Ombudsman and 10 Regional Ftomess Boards were established m receive commznts Isom <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each uvzncv's <br />responsiveness to small business. If you arc a small business (a business with 500 or (ewer employees including those of affiliates) page l of <br />and wish to comment on the enforcement or compliance acuvities of OSM, call I.888-REG-FAIR (I-383-Ti4-3237). a.„.,,W o:.rm~„ rra+ <br />