My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE35104
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE35104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:44:47 PM
Creation date
11/21/2007 2:29:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Enforcement
Doc Date
10/10/1996
Doc Name
SENECA II-W MINE PN C-82-057 NOV C-95-023
From
SENECA COAL CO
To
DMG
Violation No.
CV1995023
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiii iii <br />999 <br />E~~A <br />S Coal Company Seneca Coal Company <br />RECEIVEC <br />October 7, 1996 <br />OCT 10 1996 <br />Ms. Erica Crosby <br />Division of Minerals and Geology DIVISIOndfMinerms~htlbl[igy <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />R&: Seneca 22-W Mine Permit C-82-057, NOV C-95-023 <br />Dear Ms. Crosby: <br />This correspondence is a request for a final extension of time for <br />the abatement of NOV C-95-023 to the Seneca II-W Mine Permit C-82- <br />057. The current abatement deadline for this NOV is Thursday, <br />October 10th. <br />The Division approved Technical Revision No. 25 on August 26, 1996. <br />This revision provided the revised plan for the field work <br />necessary to abate this violation. Upon completion of the public <br />comment period in the middle of September, Seneca initiated work on <br />the abatement plan. We have removed the topsoil over the area which <br />needs to be regraded. Seneca still needs to get the final slope <br />back to a 3:1, replace the topsoil and revegetate the redisturbed <br />acreage. Because of the final construction work required to move <br />the 650 dragline from the Seneca II mine to the Yoast property, all <br />mobile equipment operators had been assigned to this project. Since <br />the dragline should start walking sometime this week, we will now <br />be able to complete the remaining abatement work. Unfortunately, <br />those tasks will not be completed by Thursday the 10th. I am asking <br />for a final 60-day extension of the current deadline to December <br />9th, to complete the field work which is in process. <br />Should you or any other members of the Division have any questions <br />regarding this information, please do not hesitate to contact me. <br />Sincerely, <br />~ .~• G~. <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />c: Gary Wendt (PWCC) <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.