Laserfiche WebLink
CIRCES Cost Estimatin Software <br />PROJECT IDENTIFICATION <br />Agency or organization name :OMG <br />Permit or otherjob action :TR-Of <br />Task description : Regrade stream channel and two dikes in north instream <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D7R Series Il - 7SU <br />Horsepower : 2 <br /> Blade <br />type <br />: Semr-Universal 40 <br /> Attachment no. 1 :ROPS Cab <br /> Attachment no. 2 :3-shank ripper Shift basis : 1 per day <br /> <br />Cost Breakdo <br />~ <br />Utilization Data source : (CRG) <br />wn Ownership casVhour : $40 <br />61 <br /> <br />Operating cosUhour: . <br />NA <br />$48 <br />73 <br /> <br />Ripper op. cost/hour : . <br />100 <br />$0 <br />00 <br /> <br />Operator cost/hour: . <br />0 <br />$31,76 NA <br /> Total unit cosUhour : $120.50 Total fleet cosU hour : $120.50 <br />MATERIAL QUANTITIES <br />Initial <br /> <br />volume : 1,200 Swell <br />LCY <br />facto Loose <br /> r : NA volume : <br />_ y_ _ 00 <br />1 LCY <br />Source of estimated volume :Assume 1200' x 45' bank graded@ .Sac. fr./ac. <br />Source of estimated swell f <br />t plus 2-100 c. y. dikes <br /> ac <br />or :NA <br />HOURLY PRODUCTION <br /> Job Condition Correction Factors <br /> Source <br />Average push distance : 55 feet Operator skill : 0.75 (avg.) <br />Unadjusted hourly production : 989.1 LCYlhr Material consistency : 0.80 (Cat HB) <br /> Dazing method : 1.00 (gen.J <br />Material consistency description : Visibility : 1.00 (avg.) <br />Dry, non-cohesive Job effciency: 0.83 (lshiff/dayJ <br /> Spoil pile : 0.70 (fnd-m!) <br />Average push gradient : 9.00 / <br />(pos) Push gradient : 0.81 (Cat HB) <br /> <br />Average site altitude : <br />5,380 feet Altitude : 1.00 <br />(Cat HB) <br /> Material weight : 0.71 (Cat HB) <br />Material weight : 3,250 Ibs/LCY Blade type : 1.00 (S/SU/U) <br />Weight description : Net correction : 0.20 <br /> <br />Grave! - Pitrun ~ - <br /> Adjusted unit production : 19770 LCY/hr <br /> <br />' Adjusted fleet production : 197.70 LCY/hr <br />JOB TIM~ST ~ ~ ~- '~- - <br />Fleetsize : 1 Dozers) <br />Total job time : <br />6 <br />07 <br />H <br /> <br />Unit cost : $0 610 /LCY <br />~ . <br />--- ours <br /> <br />Totaljob cost : - <br />$731 <br />