Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # <br />Date <br />User <br />52b State :Colorado <br />04/13/2005 <br />SSS <br />County :Delta <br />Site : Tri-County Gravel <br />Agency or organization name :DMG <br />Permit or otherjob action :TR-Ol <br />Task description :Rip facilities area <br />HOURLY EQUIPMENT COST <br />to task s2a soil <br />Basic machine :CAT 16H <br />Attachmentno.1:NA <br />Attachment no. 2 :Multi-shank ripper <br />Cost Breakdown <br />Utilization <br />Ownershipcost/hour <br />Grader operating cosUhour <br />Ripper operating cosUhour <br />Operator cost/hour <br />Total unit cosVhour <br />Horsepower: 275 <br />Shift basis : 1 oer day <br />Data source : (CRG) <br />$54.36 NA <br />$57.05 100 <br />$4.13 100 <br />$31.95 NA <br />$147.50 Total fleet cost/hour <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 5.00 acres <br />Source of estimated acreage :Assume 5 acres <br />HOURLY PRODUCTION <br />area to be <br />$147.50 <br />Selected application :Ripping (0-3 mph) <br />Average grader speed : 1.50 mph <br />Selected blade angle ; NA degrees' `atOdegrees,blade.isperpendicular - _ <br />Effective blade length : NA feet to direction of travel. <br />Width of blade overlap per pass : NA feet <br />Net grading or ripping width per pass : 9.75 feet " "width of ripper beam on upping apprtcations <br />Unadjusted hourly unit production : 1-.7727 acres/hour <br />Job Condition Correction Factors Source <br />Average site altitude : 5,380 feet Altitude adjustment factor : 1.00 (Cat HB) <br /> Job efficiency adjustment factor : 0.80 (lsh/d, adv.) <br /> Netjob correction : 0.8000 multiplier <br />Permit/job # :M-1977-205 <br />Abbreviation :none <br />Filename : M205-s26 <br />