My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE35053
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE35053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:44:45 PM
Creation date
11/21/2007 2:27:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Enforcement
Doc Date
11/20/1992
Doc Name
TDN 92-02-244-2 TV-1 COLOWYO MINE
From
OSM
To
DMG
Violation No.
CV1992030
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r. _ e <br /> <br />STATE OF COLORADO <br />DIVISION Of MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman 81., Room 215 <br />Denver, CO 80203 <br />Phone: f3031 866-3567 <br />FAX: 1303) 832-8106 <br />DATE: November 17, 1992 <br />TO: Steve Wathen <br />FROM: Carl Moua <br />RE: Colowyo Coal Mine; C-S1-019 <br />~MR-22: Blasting Sketches and Blasting Reports <br />OF ep(O <br />N~°;; b <br />0 <br />~• <br />~ rB ]6 <br />Rny Romer <br />Governor <br />Michael B Long <br />Division Dirxior <br />The following ie my opinion concerning the appropriateness of allowing Colowyo <br />to substitute a blasting report with keyed symbols for individual blasting <br />sketches. <br />The purpose of a blasting report is allow the Division to independently calculate <br />the amount of exploaivea firing during any 8 millisecond delay. In order to <br />accomplish this, the Division needs to know the following specifics for each <br />blast: <br />- type of blast <br />- point of initiation <br />- amount. of surface delay between each charge <br />- amount of depth delay for each charge <br />- amount of explosive in each charge <br />- number of charges <br />- manner in which charges are laid out and the order of firing <br />It is the Division's responsibility to be able to figure the amount of exploaivea <br />used per 8 millisecond delay independent from the operator. Since the revised <br />blasting record submitted by Colowyo simply states the number of charges per <br />delay and the amount of explosives per charge, independent verification ie <br />difficult or impossible. <br />Independent verification can only be accomplished from a sketch, since the above <br />specifics may change with each blast. In my opinion, Colowyo should be required <br />to have a sketch for each blast as specified in Rule 4.08.5 (7). <br />M:\COAL\SFW\COLOWYO\MRBLAST.22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.