Laserfiche WebLink
<br />Geotechnical Stability Exhibit <br />Please refer to Risk Analysis work performed for 1997 permit amendment addr~;ssing <br />final highwall configuration. The additional highwall areas will portray similar rock <br />qualities to [hose reflected in the 1997 study. No change in risk factor as comp~ired to <br />existing highwall conditions and final configuration is anticipated. <br />27 <br />