Laserfiche WebLink
<br />of the mining operation and through perpetuity for stormwater drainage control from the <br />site and neighboring areas. The Stormwater Management Plan is designed to a~ntrol <br />storm~vater flowing from the west slowing the velocity by using several additional <br />settling ponds. <br />(4) A scale and mobile scale house within the affected land boundaries belonging to the <br />mine operator. Tezak Heavy Equipment Company office building is located northeast of <br />the scale and scale house. <br />(5) A maintenance shop and office building located app. 400' north of Tunnel Drive but <br />not within affected land boundaries. This building is to house the maintenance operations <br />of Tezak Heavy Equipment Company, Inc. This site can be located on the map:; as the <br />building currently located just west of the main haul road app. 400' north of the <br />intersection of the existing haul road and Tunnel Drive. <br />(6) soils information will be presented in Exhibit I <br />(7) no aerial photos will be presented in this amendment permit package. <br />(8) please find a complete list of all neighboring land owners within 200' of affected <br />land boundaries. <br />