My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE35003
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE35003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:44:43 PM
Creation date
11/21/2007 2:26:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
Enforcement
Doc Date
10/6/1989
Doc Name
CORRECTIVE ACTION PLAN CAP FOR SNYDER QUARRY ACCESS ROAD PN M-77-210
Violation No.
MV1989015
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~' <br />' It should be noted that in the case of the proposed HR-6 culvert crossing <br />at MP 0.14 a 24" culvert is recommended. The Basin Master Plan did not <br />' indicate a culvert was required at this location, however based on topography <br />one probably should have been shown. The new criteria together w(th the⢠gze <br />design storm results in a theoretical 36" crossing. The 24" sizes is <br />I' recommended in order to be consistent with the existing crossing under Cedar <br />Heights Drive. Any overflow will continue Easterly down the access road to <br />' the existing 24" and 54" CSP's near the Security entrance. The location of <br />the existing Improvements along the Cedar Heights Drive (not consistent with <br />' the Master Plan) will result in the runoff being carried in the street for <br />approximately 700 feet. <br />The plan to accommodate surface runoff is a refinement and update of <br />recommendations initially made in the Basin Master Plan. Installation of the <br />facilities will result in flows being carried across the road to the Snyder E'ork <br />drainage Instead of along the access road and should result in a significantly <br />reduced flow at the Security entrance. The Operator will provide functional <br />maintenance on all culvert crossings proposed in this Plan. <br />' SURFACE DISTURBANCES <br />' The plans for corrective action on the surface disturbances includes a <br />combination of reshaping, regrading or removal of material along with <br />revegetation. Again, for purposes of presentation of the plan for this i1:em, <br />two categories have been defined, one oP the preparation of the disturbances <br />and one of the revegetation. The Pormer is discussed in this subsection, the <br />' latter in the "Revegetation" subsection. <br />' I. AREA 1 AND INUNDATION UPSTREAM. The Area 1 disturbance is <br />one of stabilizing the slope after a fill slope failure. The selected <br />' corrective action includes flattening the slope to the recommended <br />maximum 2:1 and filling of the area of inundation. This work will be <br />completed under the observation of the geotechnical consultant. the <br />' existing and finished grades are shown in detail in both an Area 1 <br />cross-section and a I"=50' detail In the Exhibits. <br />J <br />to <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.