<br />~' <br />' It should be noted that in the case of the proposed HR-6 culvert crossing <br />at MP 0.14 a 24" culvert is recommended. The Basin Master Plan did not <br />' indicate a culvert was required at this location, however based on topography <br />one probably should have been shown. The new criteria together w(th the• gze <br />design storm results in a theoretical 36" crossing. The 24" sizes is <br />I' recommended in order to be consistent with the existing crossing under Cedar <br />Heights Drive. Any overflow will continue Easterly down the access road to <br />' the existing 24" and 54" CSP's near the Security entrance. The location of <br />the existing Improvements along the Cedar Heights Drive (not consistent with <br />' the Master Plan) will result in the runoff being carried in the street for <br />approximately 700 feet. <br />The plan to accommodate surface runoff is a refinement and update of <br />recommendations initially made in the Basin Master Plan. Installation of the <br />facilities will result in flows being carried across the road to the Snyder E'ork <br />drainage Instead of along the access road and should result in a significantly <br />reduced flow at the Security entrance. The Operator will provide functional <br />maintenance on all culvert crossings proposed in this Plan. <br />' SURFACE DISTURBANCES <br />' The plans for corrective action on the surface disturbances includes a <br />combination of reshaping, regrading or removal of material along with <br />revegetation. Again, for purposes of presentation of the plan for this i1:em, <br />two categories have been defined, one oP the preparation of the disturbances <br />and one of the revegetation. The Pormer is discussed in this subsection, the <br />' latter in the "Revegetation" subsection. <br />' I. AREA 1 AND INUNDATION UPSTREAM. The Area 1 disturbance is <br />one of stabilizing the slope after a fill slope failure. The selected <br />' corrective action includes flattening the slope to the recommended <br />maximum 2:1 and filling of the area of inundation. This work will be <br />completed under the observation of the geotechnical consultant. the <br />' existing and finished grades are shown in detail in both an Area 1 <br />cross-section and a I"=50' detail In the Exhibits. <br />J <br />to <br />~~ <br />