Laserfiche WebLink
<br />1 <br />MLRB Presentation 3 March 26, 7998 <br />Ruby Trust Mine Permit No. M•79-181 <br />DURATION OF THE VIOLATION(S) <br />(The staff shall describe if the claimed violationls) is actively occurring, and for how long. Also describe any corrective <br />actions in progress, or completed by the operator.) <br />The Board may determine the duration of the violation by considering any of the following: <br />1. The date of the inspection that identified the potential violationls); <br />2, When the corrective action is completed; <br />3. When did or will the activity that caused the violation(s) cease; <br />4. The date the Board ordered corrective actions will be or are completed; <br />5. The date the Board ordered corrective actions begin; and <br />6. Any other relevant evidence. <br />BOARD JUSTIFICATION FOR DURATION <br />1. The inspection date that identified the potential violation(s). <br />2. The date the operator completed the corrective action. <br />3. The date the activity that caused the violation(s) ceased. <br />4. The date the Board ordered corrective actions will be or are completed. <br />5. The date the Board ordered corrective actions shall begin. <br />6. Any other relevant evidence. <br />BOARD JUSTIFICATION FOR THE AMOUNT OF THE CIV1L PENALTY AND POSSIBLE <br />SUSPENSIONS <br />BOARD ORDERED CORRECTIVE ACTIONS: <br />7. Staff recommendations. <br />2. Staff recommendation(s) with the <br />Chair - fined Land Rectamati n Board: <br />date, 19 <br /> <br />