Laserfiche WebLink
Colorado Division of Minerals and Geology <br />ESTIMATING FORM - SCRAPER WORK <br />TASK N0. 3 PREP. BY: CLK PERMIT N0. M-93-041 <br />----____-- -------- -----__--- <br />DATE 08/18/95 FILENAME: M041-3 MINE: Dove Fla[s Quarry <br />PERMIT ACTION TR-001 <br />TASK DESCRIPTION Replace 1' topsoil from east stockpile <br />HOURLY EQUIPMENT COSTS: <br />_ _____ ______ <br />[Q„~[y: Bg1LDER <br />Scraper team make-up <br />Sirq le, Double or Triple <br />Labor Zone 1 Shifts 5 <br />Equipment Descriptions <br />CAT 637E with 1-D9N push loading dozer 8 BOPS cab <br />Road mei nt. - Grader N/A <br />- Water T.: N/A <br />Scraper Team <br />Scraper Dozers) <br />Equipment Fileneme:637ED9N1 0 <br />Utilixetion on job: 100X 95X~ <br />________ ________ <br />Cost Breakdown: <br />Ownership cost/hr: fb7.47 (41.88 <br />Operating cost/hr: (128.59 (70.44 <br />Operator cost/hr: 523.13 522.95 <br />Unit subtotals: (219.20 5135.26 <br />Scraper team subtotal (573.65 <br />Total Work Team Cost/Hr: f573.65 <br />MATERIAL QUANTITIES: <br />___________________ <br />___________________ <br />Beg. <br />Volume: 111600 CCY <br />Cu.Yd. ---------- Swell <br />Volume: 111,600 CCY Factor: <br />Source of quantity take-off: Am-01 <br />Source of est. swell factor: N/A - <br />Road Maintenance <br />Grader Water [ruck <br />N/A N/A <br />N/A N/A <br />N/A N/A <br />N/A N/A <br />N/A N/A <br />N/A N/A <br />Naint. subtotal N/A <br />Loose <br />1.215 Volure: 135,594 LCY <br />