Laserfiche WebLink
HazeltinelRoad Runners Rest IllBrinkmann-Woodward Gravel Pits lining Project -Design Technical Memorandum <br />Dem~er Water <br />August 2003 <br />Section 5 -Future Considerations <br />Based on the assumptions and considerations used for this study, the following issues need to <br />be addressed during future phases of the project: <br />l . Conduct analysis to identify appropriate rate of drawdown to maintain side slope <br />stability prior to lowering reservoir. <br />2. Conduct analytical and design work to select the permanent configuration of the side <br />slopes of the reservoir based on the anticipated reservoir operations (i.e., rapid <br />drawdown, tong-term empty, etc.}. <br />3. Evaluate the adequacy of the stabilization fill for the permanent side slopes based on <br />selected reservoir operations. <br />GEI Consultants, Inc. 24 o:oso o:-o,-;, in.nud~~~r u~~e~rm <br />