My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-04-30_REVISION - M1981302
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981302
>
1997-04-30_REVISION - M1981302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2022 4:10:41 PM
Creation date
11/21/2007 2:24:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981302
IBM Index Class Name
Revision
Doc Date
4/30/1997
Doc Name
DEEPE FARM PIT-AMENDMENT 002 ADEQUACY REVIEW PN M-81-302-AM 002
From
DMG
To
HART ENVIRONMENT
Type & Sequence
AM2
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t III 'llllllllllll III <br /> 95 lAi E OF COLOMDO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Depa313 Sherman <br /> of Natural Resources 1 <br /> 1]1 3 Sherman SI.,Room 215 <br /> Denver,Colorado 80203 <br /> Phone:(303)866-3567 <br /> FAX:1303)832-8106 DEPARTMENT <br /> NATUM <br /> RESOURCF <br /> Rov Romer <br /> Governor <br /> April 30, 1997 lame,s Lochhead <br /> E.eco,w D,wto, <br /> Mr. Michael J. Han Mirhael 8.Long <br /> D,�,s,on Dnecror <br /> Hart Environment <br /> P.O. Box 1303 <br /> Boulder, CO 80306 <br /> RE: DEEPE FARM PIT- Amendment 002 Adequacy Review <br /> Permit No. M-81-302 - AM 002 <br /> Dear Mr. Han: <br /> The Division has reviewed the above-referenced amendment and has the following questions: <br /> 1) By filling an additional 33.9 acres,which were originally proposed as water surface, additional <br /> topsoil will be needed. Calculating an average depth of 7 inches of topsoil times 33.9 acres,the <br /> Division estimates that an additional 31, 917 cubic yards of topsoil will be required. <br /> Please describe the total area of disturbance which has not yet been topsoiled,including the 33.9 <br /> acres being added as land surface. Also, please document the amount of topsoil you have <br /> available and demonstrate that there is adequate topsoil available to cover the disturbed area <br /> with 6 to 8 inches of topsoil. <br /> 2. The Division's reclamation cost estimate completed on August 19, 1996 did not include the <br /> excavation of any bedrock shale. <br /> Since the time of the reclamation cost estimate, the operator has completed the removal of <br /> facilities and done additional finish grading work. <br /> Please provide the Division with an estimate of the remaining cubic yards of material which <br /> must be moved to obtain the proposed final contours and the average push distance required to <br /> move the material. <br /> Also. please provide the Division with the yardage of topsoil which must still be distributed. <br /> .where it must be placed and the locations of this material,as well as the total remaining acreage <br /> %khich must be seeded. <br /> WMI <br /> EXHIBIT NO 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.