Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT <br />Mine-Site Evaluation Inspection Report <br />I. Permittee/Person <br />SENECA COAL COMPANY <br />2. Address <br />P.O. DRAWER D <br />3. City 4. State <br />HAYDEN CO <br />5. Zip Code 6. Phone Number <br />81639 -~ 303-342-3645 <br />7. Operator if Different than Pertnittee <br />8. Mine Name <br />SENECA #II-W <br />9. Permit Number 10. Type <br />a. Permit b. RA <br /> C-057-82 PP ~S <br />11. Inspection Date 12. Inspection Type 13. Joint Inspection <br /> 03/3 U95 C~ ~Y Y/N <br /> <br />14. hIM - DD - YY <br />Permit Status <br />I5. Site Status <br />16. Facility Type <br /> A^ AP <br />17. OSM Office # 18. RSi # 19. Land Code <br /> 020 164 <br />20. M.S.H.A. 1D # 21. State Code 22. County Code <br /> OS-00304 OS 107 <br />23. AVS Permittee En tity ID Number 236. State Office <br /> 084730 <br />24. Performance Standard Categories <br />A. Administrative D. Backfilling & Grading H. 1 Subsidence Control Plan <br />I. 1 Mining within Valid Permit 1. 1 Exposed Openings I. Roads <br />2. 1 Mining within Bonded Area 2. 1 Contemporaneous Reclamation I. I Road Construction <br />3. 2 Terms & Conditions of Permit 3. 1 Approximate Original Contour 2. 2 Certification <br />4. 1 Liability Insurance 4. 1 Highwall Elimination 3. 2 Drainage <br />5. 1 Ownership and Control 5. 1 Sleep Slopes (includes downslope) q. 1 Surfacing and Maintenance <br />6. 3• Temporary Cessation 6. 1 Handling of Acid & Toxic Materials 5. 1 Reclamation <br />B. Hydrologic Balance 7 1 Stabilization (rills and gullies) - <br />I. 2 Drainage Control E. Excess Spoil Disposal J• Signs & Markers . <br />2. 2 Inspections & Certifications 1. 1 Placement I. 1 Signs <br />3. 1 Siltation Swctures 2. 1 Drainage Control 2. 2 Markers <br />4. 1 Discharge Swctures 3. 1 Surface Stabilization K. 1 Distance Prohibitions <br />5. I Diversions 4. 1 Inspections & Certifications - <br />6. 1 EfFluent Limits L. Revegetation <br />7. 1 Ground Water Monitoring F. Coal Mine Waste I. I Vegetative Cover <br />8. 1 Surface Water Monitoring (Refuse Piles/Impoundments) 2. 1 Tuning <br />9. 1 Drainage -- Acid-Toxic Materials I. ~Drainage Control <br />10.2 Impoundments 2. 3 Surface Stabilization M. 1 Postmining Land Use <br />I I. 2 Stream Buffer Zones 3. 3 Placement <br />- 4. 3 Inspections and Certifications N. Other <br />C. Topsoil & Subsoil 5. 3 Impounding Structures <br />I. 1 Removal <br />G. Use of Explosives -I) <br />2. 1 Substitute Materials I. 1 Blaster Certification 2) <br />3. 1 Stora a and Protection <br />g 2. 1 Distance Prohibitions - <br />4. 1 Redistribution 3. 1 Blast Survey/Schedule <br />3) <br /> 4. 1 Warnings & Records - <br /> 5. 1 Control of Adverse Effects <br />25. Inspection Frequency 26. Inspection Hours 27. Bonded Acres 28. Acres <br />a. Date d Last <br />Stale Complete 03/08/95 <br />~ <br />0 <br />8 <br /> <br />mit Review <br />P <br />~ <br />4 <br />1581 a. Total <br />bonded <br />Inspection . a. <br />er . 2677.0 a. Permitted <br />Fr uen for revious 4 Calendar trs. <br />e9 cy P Q b. Phase 1 <br />b. Numberd Numher of <br />required comple)e <br />complete ^4 inspections ^4 24.0 b. Inspection Time 0.0 released <br />350.0 b. Disturbed <br /> <br />inspecions conducted <br /> <br />~'0 <br /> <br />0.0 c. Phase II <br /> <br />releazed (Estimated) <br />c. Number of Numherof <br />required ^ partial _ ^ <br />artial <br />g mspedions 10 ~ <br />15 <br />0 c. Travel Time ~ <br />0 <br />0 d. Phase III <br />Page I of S <br />, <br />p <br />mscedions condude0 . d. Report Writing . released ,~,,,,arWy,_„~~ <br />