My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-02-04_REVISION - M1998014
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998014
>
2004-02-04_REVISION - M1998014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:47:45 PM
Creation date
11/21/2007 2:23:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998014
IBM Index Class Name
Revision
Doc Date
2/4/2004
Doc Name
2nd Adequacy Review response
From
TAL
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Following is an estimate of reclamation costs. Bear in mind that this estimate is based on toda~s cost and is <br />subject to inflation and economic fluctuations. Changes and revisions as a result of the review process to the <br />accompanying reclamation plan may also affect the total cost. <br />PHASE 18 STAGING AREA <br />Equipment: Dozer 8 Scraper Avg. Push Grade: 17 Avg. Push Distance: ~ft <br />Avg. Haul Grade: 1% Avg. Haul Distance: 975 f <br />ITEM DESCRIPTION UNIT QUAN. UNIT TOTAL <br /> PRICE <br />1 Mobilization <45 mi. LS $ 3,000.00 <br />2 Grading and Sloping CY 72,000 $ 2.00 144,000.00 <br />3 Rip Pft Floor 2 ft. AC 22.5 $ 250.00 5,625.00 <br />4 Place Top Soil CY 33,800 1.50 50,700.00 <br />5 Seed, Mulch, Tack, & Fertile <br />" <br />" AC 24 125.00 3 <br />000.00 <br /> TYPE <br />A , <br />6 Seed, Mulch, Tack, & Fertile <br />" <br />" AC 7.3 420.00 3 <br />066.00 <br /> Side Slo es TYPE <br />B , <br />7 Demo./Dispose Conc. Batch LS 10 <br />000.00 <br /> Plant Structure , <br />8 Demo./Dispose Conc. Batch CY 200 20.00 4 <br />000.00 <br /> Plant Foundation , <br />9 Demo./Dispose Conc. Batch SY 1 <br />252 10.00 12 <br />500.00 <br /> Plant Flatwork , , <br />10 Pad o./Dispose Asphalt Plant SY 5,100 5.00 25,500.00 <br /> <br />11 Demo./Dispose Steel Building LS 5,000.00 <br />12 Demo./Dispose Steel Building CY 90 20.00 1,800.00 <br /> Foundation <br />13 Demo./Dispose Conc. Washout CY 200 20.00 4,000.00 <br />14 Demo./Dispose Conc. Fuel CY 20 20.00 400.00 <br /> Containment <br /> Subtotal $272,591.00 <br />15 Indirect Costs LS 10,909.00 <br /> Subtotal 283,500.00 <br />16 Project Management LS 17,000.00 <br /> TOTAL PHASE 18 STAGING $300,500.00 <br />NOTE: <br />APPROXIMATELY 30,000 TONS OF CONCRETE RUBBLE IS INCLUDED WITHIN ITEM 2, SLOPES. HAUL AND PUSH <br />DISTANCES ARE INDICATED ABOVE. <br />Rev. 08/10!03 <br />01112/04 <br />olnnga <br />
The URL can be used to link to this page
Your browser does not support the video tag.