My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE34891
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE34891
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:44:39 PM
Creation date
11/21/2007 2:23:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
6/30/1995
Doc Name
SAN LUIS PROJECT PN M-88-112
From
DMG
To
BMRI
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• iii iiiiiiiiiiiu iii , <br />STATE OF <br />CO ILORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />1313 Sherman Sl., Room 215 y <br /> <br />Denver, Colorado 80203 Il <br />~~ <br /> <br />Phone: (3071 866-3567 I <br />FAX: (307)832-8106 <br /> DEPARTMENT OF <br /> NATURAL <br />June 30, 1995 RESOURCES <br /> Roy Romer <br />Ms. Sally Hayes Governor <br /> <br />Battle Mountain Resources, Inc. lames 5 Lochhead <br />Execmive Direcor <br />P.O. Box 310 Michael B. Long <br />San Luis, CO 81152-0310 Division Director <br />RE: San Luis Project, Permit No. M-88-112 <br />Dear Ms. Hayes: <br />As we discussed during my June 12-13, 1995 inspection trip there are a icouple of <br />changes that need to be made to the list of monitoring and reporting req~(irements I <br />sent you on June 1, 1995. <br />The main embankment piezometers must be monitored once a month arjd the tailings <br />piezometers monitored every quarter. The change is you only have to r port the data <br />once a year in your annual report. You need to add to your list that the ow rate <br />from the tailings impoundment to the collection pond must be monitored onthly and <br />the data reported once a year in your annual report. In addition, if water is detected <br />in any of the piezometers BMRI must report this information to the Division within one <br />week. These changes were prompted by the requirements of TR-16. <br />If you have any questions give me a call. <br />Sincerely, <br />~~~~-4 ~~ <br />James Dlllle <br />Environmental Protection Specialist <br />M:\OSS\ammlchanpes.jd <br />
The URL can be used to link to this page
Your browser does not support the video tag.