Laserfiche WebLink
~i <br /> <br />Editorial Comments on: <br />"MEMORANDUM OF UNDERSTANDING <br />BETWEEN THE <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />AND <br />3ATTLE MOUNTAIN RESOURCES, INC." <br />Section V. ADMINISTRATION OF THIRD PARTY SAMPLE COLLECTION <br />A <br />C <br />Sampling Location and Frequency <br />1. [Delete the words "no more than" and "and Board apdroval of <br />the MOU" from the first sentence.] <br />[Add the following listing of sampling locations to parag~raoh 2. <br />2. "a. Ground Water Monitoring Wells M-6, M-7, M-8, -9, M-12 <br />and M-13; <br />b. Surface Water Monitoring Site RS-4; and <br />c. The Lower and Upper Tailings ponds, and the C llection <br />Pond." <br />Add the following new third paragraph: <br />3. "In the event that the third party sampling determi es BMRI's <br />monitoring data derived from the tailings facility ode <br />inaccurate or unreliable, DMG will direct the third party <br />sampling contractor to conduct additional independe t <br />sampling and subsequent sample analysis, at the sol <br />discretion of the DMG." <br />Sampling Collection Procedures <br />[Amend the first paragraph to readl <br />1. "The third party sampling contractor shall observe MRI <br />complete the sampling and filtering of the collecte samples." <br />[Amend the third paragraph to read] <br />3. "The third party sampling contractor shall observe he <br />decontamination of all sampling equipment, bailing nd sample <br />collection." <br />[Amend the second sentence of paragraph 5 to read] <br />"If concurrence cannot be reached after resampling, the <br />sample shall be retained and submitted fur analysis, but <br />designated as 'rejected' and be considered in dispu e." <br />