Laserfiche WebLink
07/07/1997 11:36 719-543-139 BARNHART AGENCY• PAGE 02 <br /> r. <br /> Estimated Reclamation Costa <br /> 1. Discing or scarifying - <br /> $52.50/A x 9.9 A 519.75 <br /> 2. Seeding <br /> grass seed - $54.50/A x 9.9 A 539.55 <br /> drilling - $17.50/A x 9.9 A 173.25 <br /> fertilizer-40#available N&P/A <br /> - $22.00/A x 9.9 A 217.80 <br /> application - $12.50/A x 9.9 A 123.75 <br /> weed control- $26.00/A x 9/0 A 257.40 <br /> S1,311.75 <br /> 15% unsuccessful 196.76 <br /> $1,508.81 <br /> 3. Topsoiling w/front-end loader, dozer, and/or scraper <br /> $.75/cy x 800 cy x 9.9A 5,940.00 <br /> 4. Mobilization and de-mobilization costs 1.400.00 <br /> $9,358.26 <br /> 5. Public Liability Insurance @ 1.55% 145.21 <br /> 6. Contractor's performance Bond @ 0.975% 91.34 <br /> 7. Contractor's profit @ 10% 936.83 <br /> $10,541.64 <br /> Indirect costs @ 18.5^ 1,950.20 <br /> DMG administrative costs @ 5% 624.59 <br /> Total Projected Costs $13,116.43 <br /> The applicant requests that the present surety bond in excess of$30,000 be reduced to a maximum <br /> of$14,000,00. <br />