My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-08-22_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-08-22_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:51 PM
Creation date
11/21/2007 2:22:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/22/2003
Doc Name
Valley Leach Phase 14B
From
CC & V
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6ale3er Assaelates Inc. <br />~t Unton Bautavard, 5urte 3~ <br />lakawood. CO USA 80228 <br />Telephone (303) 986-0540 <br />Fax ('+03: 485-2080 <br />August 2Q 2003 <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor. Colorado 80860 <br />Attention: Mr. Ron Roberts <br />RE: PHASE IVB OSA LINER ACCEPTANCE <br />Dear Ron: <br />:'Golder <br />Golder Associates Inc, (Golder) has prepared this letter for the Cripple Creek & Victor Gold Mining <br />Company (CC&V) regarding acceptance of a portion of the Phase IVb Ore Storage Area (OSA) liner. <br />The referenced portion of liner is located on the Phase 111 ore slope, above the Pregnant Solution <br />Storage Area (PSSA); between the 9606 bench and 9636 bench (see Figure 1). The Phase ^I VLF <br />liner system is beneath this bench. <br />Golder has completed CQA observation, testing, and documentation of the liner Bedding Fill (BF), <br />100-mil smooth LLDPE liner, and Drain Cover Fill (DCF) for this area. The subgrade, BF, <br />geomembrane liner, and DCF comply with the technical specifications for the Phase IV project and <br />are accepted for ore placement and solution application. Golder will present final certification of this <br />portion of the liner in the Phase IVb OSA certification report. <br />Golder appreciates the ongoing opportunity to provide engineering services for the Cresson Project. <br />Please contact the undersigned with any questions. <br />Sincerely, <br />GOLDER ASSOCIATES INC. <br />J .Lupo, Ph.D., P.E. <br />'Sr. Project Manager <br />c~oovzo~mroow»zzo~.m oo.oa i s um~„ccgn.e« <br />
The URL can be used to link to this page
Your browser does not support the video tag.