My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE34808
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE34808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:44:35 PM
Creation date
11/21/2007 2:21:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Enforcement
Doc Date
11/25/2005
Doc Name
Abatement Extension Request
From
J.E. Stover & Associates Inc
To
DMG
Violation No.
CV2005008
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br />P.O. BOX 60340 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245-4101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />November 18, 2005 ~~c'~~~~® <br />NOV 2 5 2005 <br />Dan Mathews ,°IS and Gep1o~ <br />Division of Minerals and Geology p~m'w°°`M~~ <br />101 South 3`d, Suite 301 <br />Grand Junction, CO 81501 <br />- Re; Central Appalachia Mining LL-~ - - - - - -- <br />McClave Canyon Mine <br />NOV CV-2005-008 <br />Permit C-80-004 <br />Dear Mr. Mathews: <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />Notice of violation number CV-2005-008 was written on October 26, 2005 for "Failure to <br />maintain upland diversion culverts and a haul road culvert in accordance with approved <br />designs and applicable performance standards'. The NOV was modified on November 1, <br />2005 to add an 18" diameter haul road culvert. The abatement date for the NOV was <br />extended until November 18, 2005. <br />Central Appalachia Mining, LLC (CAM) has been diligentlyworking to maintain the culverts. <br />The maintenance work was delayed by a storm event that occurred during the week of <br />October 18~'. All of the culverts except Culvert D (42")have been cleaned. CAM mobilized <br />a vacuum truck to finish cleaning Culvert D. Work on cleaning Culvert D is about 90% <br />complete. <br />CAM needs additional time to perform the abatement steps required by the NOV. Please <br />extend the abatement date for the NOV until November 25, 2005. <br />S~incere~y, <br />'J. E~~er, P.E. <br />Consulting Engineer <br />cc: Mine Office <br />
The URL can be used to link to this page
Your browser does not support the video tag.