Laserfiche WebLink
CIRCES Cost Estimating Software <br />Permit or otherjob action :Conversion No. 1 <br />Task description :Tr8I1SpOff feC181118f/0/1 eQU%pI17ellf f0/f/O!-l S/fe <br />................ <br />EQUIPMENT TRANSPORT RIG COST <br />Shift basis : <br />1 per day <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2005) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, SOT, and f00TJ <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cosUhour : $25.36 $28.12 $34.53 <br /> Operating cosUhour: $36.15 $37.62 $41.10 <br /> Operator cosUhour : $27.40 $27.40 $27.40 <br /> Helper cost/hour : $0.00 $25.15 $25.15 <br /> Total Unit CosUhour : $88.91 $118.29 $128.18 <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />CosUhr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series 11 - 8SU 52.55 $53.92 $128.18 1 $182.10 $128.18 $0.00 <br />-Cat 633E Series 2 (2001) 56.34 $65.49 $128.18 1 $193.67 $128.18 $0.00 <br />-Reveoetation Eouin. 20.00 $20.00 $88.91 2 $217.82 $177.82 $0.00 <br />Subtotals : $593.59 ~ $434.18 ~ $0.00 <br />Agency or organization name :DMG <br />Task # : 058 State :Colorado PermiUjob # : M-2001-088 <br />Date :06/14/2006 County :Mesa Abbreviation :none <br />User : SSS Site :Upland Gravel Filename :MOSS-05a <br />