Laserfiche WebLink
-2- <br />6. Name of owner of subsurface rights of affected land: John L . Ary <br />If 2 or more owners, "refer to Exhibit O". <br />7. Name of owner of surface of affected lead: John L . Ary <br />8. Tvce of minine operation: X Surface Underground <br />9. Location Information: The center of the area where the majority of mining will occur: <br />COUNTY: Fremont <br />PRINCIPAL MERmIAN (check one): R 6th (Colorado) _ 10th (New Mexico) _ Ute <br />SECTION (write number): S 1 ~ <br />TOWNSHIP (write number and check dtrection): T 19 North X South <br />RANGE (write number and check direction): R 69 _ East X West <br />QUARTER SECTION (check one): _ NE X NW _ SE _ SW <br />QUARTER/QUARTERSEOTION (check one): NE _ NW _ SE R SW <br />GENERAL DESCRIPTION: (the number of miles and direction from the nearest [own and the approximate elevation): . 5 miles <br />west of Florence, CO approximately 5,260 ft. elevation <br />10. Primary Mine Entrance Location (report in either Lati[ude/Longitude or UTM): <br />Latttude/Lonaitude <br />Latitude(N): deg min sec OR Latitude (N) 38° 23' N (Sdec;rttnl <br />places) <br />Longitude (VV): deg min sec Longitude(W7 105 ° O8 ~ W (5 decimal places) <br />Universal Tranverse Mercator (UTMI <br />UTM Datum (specify NAD27, NAD83 or WGS 84) Zone <br />Northing <br />Easting <br />I I. Primary future (Post-mininel land use (check one <br />Cropland(CR) _ Pastureland(PL) <br />X Rangeland(RL) _ Foresuy(FR) <br />Residen[ial(RS) _ Recreation(RC) <br />_ Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />IndustriaUCommercial(IC) <br />_ Solid Waste Disposal(WD) <br />12. Primary present land use (check one <br />_ Cropland(CR) Pastureland(PL) <br />% Rangeland(RL) Forestry(FR) <br />Residential(RS) Recrea[ion(RC) <br />Developed Water Resources(WR) <br />Generl Agriculture(GA) <br />Wildlife Habitat(WL) <br />_ IndustriaUCommercial(IC) <br />]3. Method of Minine: Briefly explain mining method (e.g. truck/shovel): Scraper will remove topsoil and <br />overburden. Front end loader will feed aggregate processing equipment and haul trucks. <br />