Laserfiche WebLink
EXHIBIT L -RECLAMATION COSTS <br />As with the original permit application, it is assumed that reclamation will be <br />performed at the cessation of mining. The following assumes the total area to be <br />reclaimed is 26 acres (area within the amended mining limits). The access road <br />from the existing permit area to the amended area will remain at the request of <br />the landowner. <br />Descri tion Unit Unit Cost Cost <br />Backfillin OB 41,500 CY $ .75 $ 31,125 <br />To soil/ Gradin 20,900 CY .85 17,765 <br />Fertilizin 2,300 LBS .48 1,104 <br />Seedin 26 AC 62. 1,612 <br />Labor 44 HRS $ 45. 1,980 <br />Mobilization 2,100 <br /> <br />Total $ 55,686 <br />( Earthwork/ Grading costs include labor, fuel and overhead costs) <br />?~ ;.,,~' <br />U'+. ~~ <br />~ _. ~ ~~~~ <br />Dig?s~~~r~ 7?Qe~ I <br />i~ •.~~ Reclam. <br />?and Sa~,< ~' <br />