My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-10-23_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1993-10-23_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2021 10:17:14 AM
Creation date
11/21/2007 2:17:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
10/23/1993
Doc Name
DRAFT AGREEMENT FOR 3RD PARTY OVERSIGHT & REVIEW & MEMO OF UNDERSTANDING
From
PARCEL MAURO HULTIN & SPAANSTRA PC
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ s <br />to pay any bonus, damage or other claim asserted by Contractor for its expected profit on <br />the uncompleted portion of the Work. <br />8.3 Either DMG, BMRI or both parties together may at any time by written <br />notice to Contractor, require Contractor to stop all or any part of the Work for a period of <br />up to ninety (90) days after the notice is delivered to Contractor (the "Stop Work Order"). <br />Upon receipt of the Stop Work Order, Contractor shall comply immediately with its terms <br />and take all reasonable steps to minimize the incurrence of costs allocable. to the Work <br />covered by the Stop Work Order during the period of work stoppage. Within a period of <br />ninety (90) days after a Stop Work Order is delivered to Contractor, or within any extension <br />of that period to which the parties have agreed, BMRI, after consulting with DMG, shall <br />either cancel the Stop Work Order or terminate the Work covered by the Stop Work Order <br />as provided above. Contractor shall resume Work upon cancellation or expiration of any <br />Stop Work Order. Equitable adjustments shall be made in the delivery schedule or prices <br />hereunder, or both, and this Agreement shall be modibed in writing accordingly, if the Stop <br />Work Order results in an increase in the time required for the performance o:~ the Work or <br />in Contractor's costs properly allocable thereto. <br />17- <br />
The URL can be used to link to this page
Your browser does not support the video tag.