My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-10-23_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1993-10-23_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2021 10:17:14 AM
Creation date
11/21/2007 2:17:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
10/23/1993
Doc Name
DRAFT AGREEMENT FOR 3RD PARTY OVERSIGHT & REVIEW & MEMO OF UNDERSTANDING
From
PARCEL MAURO HULTIN & SPAANSTRA PC
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />7.5 The liability of Contractor under this Agreement shall not be limited to or by <br />the insurance coverage required of Contractor under Paragraph 7.2 above. <br />7.6 Any and all deductibles in the above-required insurance policies shall be the <br />sole responsibility of Contractor. <br />Article 8 -Termination and Sto~Work <br />8.1 BMRI may, without prejudice to any other rights or remedy, and upon giving <br />both DMG and Contractor written notice, terminate, in whole or in part, t}~is Agreement <br />immediately and finish the terminated Work by whatever method BMRI, iri consultation <br />with DMG, may deem appropriate. On receipt of such notice, Contractor shall, except as <br />and to the extent dvected, immediately discontinue the Work and the placing of all orders <br />for materials, facilities and supplies in connection with the performance of the Work. <br />8.2 Contractor shall have the right to terminate this Agreement based upon a <br />showing of cause. For the purposes of this Agreement, "cause" shall be limited to a failure <br />of BMRI to pay Contractor pursuant to the provisions set out in Article 3 herein. In the <br />event Contractor decides to invoke its right to terminate for cause under this section, <br />Contractor shall provide BMRI 30 days notice and provide BMRI with the oaportunity to <br />resolve Contractor's cause to terminate. <br />-15- <br />
The URL can be used to link to this page
Your browser does not support the video tag.