My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-06-28_REVISION - M2004001
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004001
>
2007-06-28_REVISION - M2004001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:06:05 PM
Creation date
11/21/2007 2:15:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004001
IBM Index Class Name
Revision
Doc Date
6/28/2007
Doc Name
Submittal
From
Lincoln County
To
DRMS
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D RECEIVED <br />LOFDAHL PIT <br />NIINING PLAN JUM,2.8 2001 <br />Division or Reclamation, <br />Mining and Safely <br />The sand and gravel being mined in this operation will be pushed by a tracked <br />dozer or front-end loader working from west to east irno a stockpile. A front-end loader <br />will then load the material from the stockpile into haul trucks. Some of the sand and <br />gravel could remain in the stockpile for several weeks. The sand and gravel will be <br />utilized in the maintenance and construction of county roads in District 1 of Lincoln <br />County. <br />Prior to removal of the sand and gravel 4 to 10 inches of topsoil will be stockpiled <br />for later use in the reclamation of the affected lands. These topsoil stockpiles will be hand <br />seeded if necessary to stabilize the piles and prevent erosion. The 2 to 4 feet of <br />overburden that underlies the topsoil will either be used as binder or stockpiled for later <br />use in the reclamation. These stockpiles will also be hand seeded as required for <br />stabilization and to prevent erosion. The maximum size area that will be mined at one <br />time would be from 7 to 8 acres. <br />This operation will be active but will be used les than 180 days per yeaz. <br />Timetable for each phase: 7 to 8 acres <br />Stripping topsoil: 3 to 5 days <br />Stockpiling overburden: approximately 5 days <br />Removal of sand and gravel: 5 to 10 years <br />Reclamation of each 7 to 8 acre phase: 15 to 20 days <br />Repeat for next phase. <br />The over burden to be removed is a mix of soil and sand and gravel that gets <br />sandier with increasing depth. The sand and gravel to be mined varies in thickness from 7 <br />to I S feet. The material that under lays the sand and gravel is a mix of clay and sand that <br />turns to clay a great depth. <br />The primary commodity being extracted is sand and gravel No incidental <br />products will be mined. <br />No explosives are used in either the mining or reclamation. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.