My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE34429
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE34429
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:44:23 PM
Creation date
11/21/2007 2:10:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981015
IBM Index Class Name
Enforcement
Doc Date
9/21/1989
Doc Name
NOV
Violation No.
CV1989021
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III <br />999 <br />MINED LAND RECLAMATION DIVISION <br />STATE OF COLORADO, DEPARTMENT OF NATURAL RESOURCES <br />NOTICE OF VIOLATION II NOV No. [,-$9- C72 ~ <br />Permit No.: ~i~P # G-81-OfSrn Mine: 1=~ru,+w <br />Type of Mine: ()N~orara,.,~~FecYatu~ County: / / <br />Operator (If Other t an Permittee): Permittee: A,Mp,/~~,oN ~ ,~(~ (~,~ Cam. <br />Mail Address: <br />Mail Address: <br />Date/Time of Inspection: '75231 <br />Inspector: I rice 4~Iy~559 /3:00 <br />Person Served: Served By: <br />ignature o person served Signature o authorized representative <br />of Mined Land Reclamation Division) <br />ease prin name an tit a Date and Time of Service: ^ <br />CERTIFIED MAIL NO. p 767 ~~7 O25 q~2/~89 9.Gb (p~ <br />Return Receipt Requeste <br />The Mined Land Reclamation Division ("the Division") has conducted an inspection of <br />the above mine and has made the findings stated in the attached schedule and has <br />found violations of the Colorado Surface Coal Mining Reclamation Act, or violations <br />of required permit conditions, listed in the attached schedule. This notice <br />constitutes a separate notice of violation for each violation listed. <br /> <br />You must abate each of these violations within the designated abatement time. <br />Where the remedial action requires submission of plans, the plans are to be <br />submitted to the Division within the designated time. You are responsible for <br />doing all work in a safe manner in compliance with all applicable laws and <br />regulations. <br />The undersigned finds that cessation of mining is is not expressly, or in <br />practical effect, required by this notice. For this purpose, fining" means <br />extracting coal from the earth or from a waste pile and transporting it within or <br />from the mine site. <br />C.R.S. 1973, 34-33-123(8) provides for imposition of civil penalties of up to <br />X5,000 for each violation and provides that each day of continuing violation may be <br />deemed a separate violation. <br />Important: Please read the reverse side of this page. <br />
The URL can be used to link to this page
Your browser does not support the video tag.