My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE34410
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE34410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:44:23 PM
Creation date
11/21/2007 2:10:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Enforcement
Doc Date
7/8/1999
Doc Name
BOWIE 2 MINE PN C-96-083 CV-99-004
From
DMG
To
BOWIE RESOURCES LIMITED
Violation No.
CV1999004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />%~"'~ <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />.AHy. <br />•;rg~ • 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 865-3567 <br />SETTLEMENT AGREEMENT <br />NOV/CO NO.: CV-99-004 <br />MINE: Bowie No. 2 Mine <br />PERMIT NO.: C-96-083 <br />OPERATOR/PERMITTEE: <br />Bowie Resources Limited <br />ATTENTION: W.A. Bear <br />ADDRESS: P.O. Box 483 <br />Paonia, CO 81428 <br />DATE ISSUED: April 15, 1999 <br />TYPE OF MINE: underground/Non-Federal <br />COUNTY: Della <br />The Division of Minerals and Geology ("the Division") issued a certain Notice of Proposed Amount of Civil <br />Penalty, and the operator requested a conference thereon, as authorized by C.R.S. 1973 34-33-123(8). The <br />requested conference having been held as required by law, on July 7, 1999, the Division and the operator hereby <br />agree as follows: <br />1. The amount of the penalty shall be $750.00; <br />2. The penalty shall be paid to the Division by the operator not later than 30 days from the date <br />this Agreement is signed by all parties; <br />3. Payment of such penalty by the operator shall constitute a waiver of all further rights to review <br />of such penalty or of the violation on which it is based. <br />This agreement shall no[ be effective unless signed by the operator within ten days after the closing date of such <br />conference, which date is set forth below opposite the signature of the Conference Officer. <br />If not signed within ten days, the Division will fix the penalty at whatever amount it deems appropriate. The <br />fixed penalty amount will likely be the original penalty assessment, based on the factors referred to in C.R.S. 1973, <br />34-33-123(8)(a). <br />OPERATOR: <br />By <br />DIVISION OF INE <br />By <br />onferer <br />By \~ <br />Division <br />ALS AND GEOLO/GY/: <br />e Officer <br />DATE: <br />DATE: 9 ~ S <br />Penalty Adjustment Reviewed <br />(Rule 5.04.3(4)(c)l <br />CRS 34-33-123(8)(c) and (d) <br />M'~OSNRpi£NPNVD1~06111D <br />
The URL can be used to link to this page
Your browser does not support the video tag.