My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-09-25_REVISION - M1988081
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988081
>
2006-09-25_REVISION - M1988081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:43 AM
Creation date
11/21/2007 2:08:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988081
IBM Index Class Name
Revision
Doc Date
9/25/2006
Doc Name
Cost Summary Form
From
DRMS
To
File
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 003 <br />Date : 09!12/2006 <br />User : ESC <br />State :Colorado <br />County :Boulder <br />Site :Phil Sheridan <br />PenniUjob# : M-1988-081 <br />Abbreviation :none <br />Filename : M081-003 <br />Agency or organization name :DRMS <br />Permit or other job action :Reevaluate amount of required bond <br />Task description : 8ac~!! site to achieve 3h:1 v <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Sedes ll - 8SU (200t Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :BOPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank dpper <br /> Data source : (CRG) <br /> Utilization °~ <br />Cost Breakdown : Ownership costlhour : $58.24 NA <br />OperaBng cosUhaur : $73.75 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator costlhour : $32.78 NA <br />Total unit cosUhour : $164.77 Total fleet casUhour : $184.77 <br /><:: a. <br />MATERIAL QUANTITIES ': # <br />Initial Swell Loose <br />volume : 750 LCY factor : NA volume : 750 LCY <br />Source of estimated volume :DRMS Estimafe <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 150 feet <br />Unadjusted howdy production : 634.3 LCY/hr <br />Matedal consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Decomposed rock - 50% Rock. <br />0.00 % (I <br />8,000 feet <br />2,900 Ibs/LCY <br />50% Earth <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Matedal weight : 0.79 <br />Blade type : 1.00 <br />Net correction : 0.38 <br />(avg.) <br />Adjusted unit production : 225.39 LCY/hr <br />Adjusted fleet production : 225.39 LCY/hr <br />JOB TIME AND COST - - <br />Fleet size : 1 Dozers) Total job time : 3.33 Hours <br />Unit cost : $0.731 /LCY Total job cost : $548 <br />
The URL can be used to link to this page
Your browser does not support the video tag.