My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-06-30_REVISION - M1977208
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977208
>
2003-06-30_REVISION - M1977208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:27 PM
Creation date
11/21/2007 2:08:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977208
IBM Index Class Name
Revision
Doc Date
6/30/2003
Doc Name
Adequacy Letter
From
DMG
To
CEMEX Inc
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMAI'lON PLAN <br />The reclamation plan for the Martin Marietta Lyons quarry is straight- <br />forward and simple. The overall idea is to put the land back to as near <br />the original land use as possible. Since the surrounding land is agri- <br />cultural, we will make dryland pasture where there was dryland pasture, <br />irrigated pasture where there was irrigated pasture and so on. In same <br />areas, the land will 6e more useful or more productive from a farming or <br />ranching point of view. Because we are removing material from the ground <br />that will never be replaced, we will leave some lakes which will enhance <br />the water storage for this area. ~ ~~ <br />The total acres to be mined is approximately 470 acres with approxi- <br />mately 1fi0 acres used for waste disposal area. Conceivably, 400 acres <br />coTbe under mi m ngr ,~ipp~ng, or rec amation at the same time. The <br />rec al matron wi~f to e p ace in condunc ion wit-F a-mimng p aTn a'"Trd accord- <br />ing to the timetable found in Exhibit "D", and the reclamation map found at_ <br />the end of this section. <br />The best way to describe the reclamation is by area; what the area was <br />like before mining and what the area will be like after reclamation. <br />The quarry is divided in two by the Boulder Feeder Canal and the Swede <br />Ditch. Part of the overall lan is to move the Boulde nd the Swede <br />Ditch into the mi a of Pi Once this is accomplished, ese <br />wo ditches will serve as reference elevations. Everything to the west of ~ <br />these ditches will slope to the ditch and everything to the east will slope <br />away from the ditch. <br />Martin Marietta Lyons quarry utilizes two types of seed mixtures in <br />Declaiming. The following is a breakdown of the two varieties: <br />Deland Mix <br />39% winter rye <br />13% ranger alfalfa <br />9% smooth broam <br />8% intermediate wheat grass <br />7% slender wheat grass <br />8% Nordan crested wheat grass <br />6% Russian wild rye <br />10% Jose tall wheat grass <br />Irrigated Mix <br />31% orchard grass <br />32% intermediate wheat grass <br />37% smooth broam grass <br />These two varieties will be referred to throughout the reclamation plan <br />as "dryland pasture mix" and "irrigated pasture mix", and will be planted in <br />such quantities in order to provide necessary cover. This is from 25 ounds <br />to 75 pounds of seed per acre. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.