My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE34302
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE34302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:44:19 PM
Creation date
11/21/2007 2:07:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063
IBM Index Class Name
Enforcement
Doc Date
2/22/1994
Doc Name
SETTLEMENT AGREEMENT
Violation No.
CV1993149
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III f~' <br />999 <br />.~ <br />STATE OF COLORAI~C~ <br />uIVI510N OF MINERALS AND GEOLOGY <br />Department o(Nalural Resources <br />1313 Sherman 5t., Room 215 <br />Denver, CO 80203 <br />Phone: 13 031 86 6-3 5 6 7 <br />FA%:(}03)832-8106 <br />SETTLEMENT AGREEMENT <br />Cessation Order No. <br />R~r~.JV~ ri <br />FFB 221984 <br />OF. ~O o <br />~~~~ <br />~ IBT6 . <br />Roy Romer <br />Governor <br />Michael B. Long <br />Division Duenor <br />Notice of Violation No. C-93-149 <br />Mine:Eastside Mine Permit No. C-84-063 <br />Permittee: Eastside Coal Company <br />Mailing Address: P.O. Box 161. Silt, CO 81652 <br />Operator: (If other than Permittee): <br />Mailing Address: <br />County: Garfield Type of Mine: Underground <br />The Mined Land Reclamation Division ("The Division") issued a certain <br />Notice of Proposed Amount of Civil Penalty, and the operator requested <br />a conference thereon, as authorized by C.R.S. 1973, 34-33-123(8). <br />The requested conference having been held as required by law, on <br />Januark 27, 1994, the Division and the operator hereby agree as <br />follows: <br />The amount of the penalty shall be 5100.00 <br />The penalty shall be paid to the Division by the operator not <br />later than 30 days from the date thereof; <br />Payment of such penalty by the operator shall constitute a <br />waiver of all further rights to review of such penalty or of <br />the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator <br />within ten days after the closing date of such conference, which date <br />is set forth below opposite the signature of the Conference Officer. <br />if not so signed, the Division will fix the penalty at whatever amount <br />it deems appropriate, based upon the factors referred to in C.R.S. <br />1973, 34-33-123(8)(d), ~, // <br />DATE: °2/~~~9 <br />Operator <br />by EASTSIDE COAI. COMPAtII' <br />DIVISION OF MINERALS AND GEOLOGY <br />DATE: a-~'3~9Y By <br />Penalty Adjustment Reviewed By <br />[Rule 5.04,3(4)(c)] <br />C.R.S. 34-33-123(8)(c)(d) <br />oC ~ I~-u~s~1 <br />C f ence Officer <br />Division Dir to <br />
The URL can be used to link to this page
Your browser does not support the video tag.