Laserfiche WebLink
58 <br />:, ,' , <br />i <br />r <br />1 <br />• • <br />1 off-site impacts violation of 34-32-116, quarry <br />2 access road. Here, because of the impot:ndment of <br />3 water, we move seriousness up to moderate. And, <br />4 therefore, the recommendation would be violation -- <br />5 to find the operator in violation, same statute. C&D <br />6 not be ordered so the operator may proceed with <br />7 reclamation. <br />B Under the corrective action, in the <br />9 Obering report that was submitted, the report stated <br />10 that a further geotechnical analysis would be needed <br />11 to continue the corrective actior. in that the <br />12 engineer that did the first report said that he felt <br />13 that it stabilized and that before removing any <br />14 material, an analysis should be done to see if the <br />15 moving material would again create a slide, agair. <br />16 create another problem, because part of the <br />17 ~orr~ective action..was„to c.r.eate :.a: dr.ai.nage --. to.•-. .., , <br />16 remove some ot,that„rock from the .drainage to allow <br />19 to it drain out <br />20 Therefore, our corrective action is to <br />21 complete the geotechnical analysis of slope <br />22 stability, to submit those designs for corrective <br />23 action by Sep tember 1, to proceed with removal of the <br />24 material from the creek dr ainage, to allow flow to <br />25 replace the damaged and destroyed trees, reseed all <br />MIDYETT REPORTING SERVICE <br />(303) 424-2217 <br />