Laserfiche WebLink
12 <br /> • <br /> 1 conjunction with another motion in the F~ermit <br /> 2 W <br />li <br />ti <br />fil <br />h <br />l <br />b <br />d t <br />h <br /> app <br />ca <br />on <br />e. <br />e <br />ave a <br />so o <br />jecte <br />o t <br />e <br /> 3 order. We feel the permit application, which was <br /> 4 filed first, and continued numerous times, should be <br /> h <br />d <br />hi <br />k i <br />l di <br />d <br /> 5 ear <br />. We t <br />n <br />t put us at a rea <br />sa <br />vantage to <br /> 5 continue on until people can have enough culpable <br /> 7 evidence. We get a notice of violation, then have to <br /> B c <br />that <br />Th <br />in <br />ument on the other side <br />f <br />h <br /> g arg <br />a <br />e <br />. <br />en <br />ear <br /> 9 that we can't request a continuance on our permit <br /> 10 amendment application because the time will run out. <br />' 11 ument was made <br />The jurisdictional ar <br /> g <br /> 12 last month by my pzrtner, Paul Evans. That certainly <br /> 13 speaks for itself. I think we're under a new <br /> 14 provision as far as the continuance. The other thing <br /> 15 I would say, as to the request for continuance of the <br /> 16 Violation, our notice indicated that we have until <br />,: 17 October 30, 1989,. tv take•..co.rr.e.cta•q•e _ac~ti~on.: ~ •And I <br />' 18 can't see hew this Board can determine severity until <br /> 19 we have had an opportunity to get reports and to <br /> 20 analyze the situation so that the Board could <br /> 21 appropriately deal with it. In fact, the fact they <br /> 22 found a possible violation, we are prepared to go <br /> 23 forward because we have been ordered to do so. We <br /> 24 certainly object to the order of hearing, and the <br /> 25 fact that we have, in this order, have a continuance <br /> <br /> MIDYETT REPORTING SERVICE <br />(303) 424-2217 <br /> <br />