Laserfiche WebLink
Patented mineral <br />claim boundary line <br />UNEXPECTED NO 1 <br />MS 18513 <br />talus slope <br />talus slope <br />0 i - <br />INCAS NO 3 <br />MS 18513 <br />patented mineral <br />claim boundary line <br />adjoining uses, <br />Wildlife habitat <br />building size and square feet <br />building <br />size <br />so ft <br />plant - -- <br />60' x 80' <br />4,800 eq ft <br />lab - - - -•- <br />20' x 30' <br />600 so h <br />shop -•- <br />30' x 40' <br />1,200 aq h <br />cruehin <br />10' x 20' <br />200 sq ft <br />tote <br />wildlife <br />Containment structure <br />INCAS NO 2 <br />MS 18513 <br />patented mineral <br />J claim boundary line <br />` / <br />outdoor Privy location <br />trees, aspen and pine <br />Q' <br />shop and equipment storage <br />30 x 40', build In 1997 <br />assay lab - 20' x 30' <br />storm water flow build In 1997 <br />Ohwiler Ridge diversion structure _- __ __.. __ - _\ <br />drainage from outside of buildings <br />Is Into ditches diverting water to <br />downslope of ridge <br />talus slope processing plant - 60' x 80' <br />- - - - build In 1997 <br />e • bulidklg she to have wood end steel pardons <br />removed end transferred of lte, concrete wogs <br />trees -.[ , aspen and ping ' 10,960' to be pushed In on concrete floors, waste rock <br />added to conform to terrain contours, arcs to be <br />graded, ripped, soil appled, mulched, and seeded <br />Patented ndary line <br />tries, aspen and pins <br />claim boundary line -- es -- - -. <br />UNEXPECTED NO 2 <br />MS 18513 <br />Jeep trail- <br />rr x A PRINTED ON NO. 1000" CLEARMIINT <br />adjoining uses, <br />wildlife habitat <br />10,680' <br />10,920' <br />10,880' ' <br />Permit Area 9.94 acres <br />10.920 <br />talus slope <br />INCAS <br />MS 17117 <br />patented mineral <br />claim boundary line <br />talus slope area to be reclaimed after any rock Is <br />i removed to fill open cuts, eyes to have crushed <br />'rock added to top of talus slope rock to smooth <br />surface wee, no soil applied or sending attempted <br />Ohwiler Ridge <br />talus slop° for waste rock source <br />for beekflli ig open cuts, 2004 <br />area of mining - either surface <br />cut and fig or underground mining <br />adjoining uses, <br />talus slope wildlife habitat <br />11,p00 _ <br />mining within permit boundary Is contained <br />within open cut area, labeled ADITS, or vain <br />structures: *Bch year's mining activity will be <br />reported on annual report showing location, <br />tonnage moved, and square feet disturbed <br />surface open cut and all and <br />mining area to have reclamation phased <br />with slmulteneaus open cut mining -- <br />Brae to be filled, graded, ripped, <br />9011 applied, mulched end seeded <br />ADIT 12 T �- <br />\,` ADIT 13 ADIT 11 <br />Q� l <br />INCAS NO 1 <br />MS 18511 <br />Patented mineral <br />claim boundary line <br />11,oao' <br />�l <br />San Juan Netional Forest <br />090 \ talus slope <br />OhWlleT iildQe <br />San Juan_ National Forest- <br />♦ �® <br />ADIT to be beckfllled with <br />waste rock and reclaimed rs <br />� surrounding terrain contour <br />6010 applied, mulched and ee.ded trees, aspen and pine 17,08p� <br />X open cut mining end tailings - ---- -- - - -- _ - <br />road to be graded Into terrain disposal area, 120' x 350', <br />storm water flow c °moors, H ed soli cuts 10' wide x yearly length, <br />diversion structure PP applied, cuts labeled b <br />mulched and seeded - Y Year <br />storm water structure to be reclaimed all .old one dumps will be removed -_ _ _ _ _ <br />Into surrounding contours. Hpped, during mining process and will tailings disposed of in open cuts storm water structure to be reclaimed <br />soil applied, mulched end seeded either be processed or used as fill - - - "- - _ Into surrounding contours, ripped, <br />In contour depression 1996 - 2004 ADIT 10 <br />sell spelled, mulched and seeded <br />trees, aspen and pine ' � _ 1 —�" 17,040, <br />\ storm water flow - -- <br />`- -- -. _ "� -- -- - leop assess road to be put - _- -_._ <br />. on Inside of road _ - stork coadftlon <br />ADIT to be beekfllled with �t - <br />back into N <br />waste rock end reclaimed to +' -- -- -- <br />surrounding terrain contours Open out are te be <br />6011 applied, mulched and eo6ded reclaimed during mining end soils stockpile area <br />_ reclamation aI uhaneous storm water flow 1995 - 2004 <br />1 projected line of vein Iq mine — Phmes diversion structure _ <br />open. It t cut to to surge ' \ <br />talus slope - - storage for storm water, <br />- • - - - --- - - - -- watei to soak Into strata \ <br />storm water flow � 1,0 <br />2002 _ road to be on Inside of road - 00' <br />-- - - - started In 1996 . _ <br />ADIT to 66 removed during open �- <br />Jeep trail not n pit cut minim, anY open tunrlaia In 2001,- awls etoeIl lb will be removed crusher building Is portable in area of open Pit _- _ undi ap l will bo to lastly see! 01 - applied to mine reclamation areas d Jeep trall <br />_ - _.. PO Y ed 20 then titstages <br />tockpile,nea will be <br />d <br />and can be removed from site �, until open cut is backflllad - 9p00 . <br />during reelBmetion ADIT 6 2003. - -- Wedetl, ripped, mulched, and seeded <br />'e ADIT 3 2001 2000 — - - - <br />�,.+,� \ 2003 2002 - 1959 storm water flow - 10,960' <br />Portable crushing plant -\ �, 1996 ADIT 9 omen structure <br />containment <br />8' x 12' M 1996 E 1996 ADIT 4 , " _ . - _ 2p00 - <br />10' x 20' In 1997 ' storm water structure to be reclaimed <br />_1986.. - Into surrounding contours, lipped, <br />..' Joining u". <br />w ➢dhfe habitat <br />10,840' location of temporary 1991, 6011 applied, - -- <br />- mulched and seeded. <br />- - P Y Proceaeing 1y9 - <br />~ 70,920, <br />plant, 1 8 2 ton per day pilot plants, Q 1999_ -) .�` ADIT to 66 b,ckfllled with w <br />1995, 1996, and 1997 - �\ \ rock and aste <br />5 temporary l� "� reddened 9 surrounding buildings of B' x 12' size terrain contours, 1896 riding -_- <br />�� _ 2011 aPPll°d, mW <br />\ •shed and seeded <br />jeep Incase road to be put / 199 <br />back Into hbtode eondltlon Northern a ^nerds, Inc, open cut <br />10,800' ADIT e <br />mining are.. from 1988, 4 stopped \ 0'880' <br />1 <br />bench cuts total are,, 60' x 350' <br />\ IT7� <br />/Ir 1996, o Wished <br />' <br />trees, aspen and pine / I ADIT 6 Pen cut roes Northern Minerals. Inc, open <br />_. _ ___ ..k ___ __.._ i Pony Express lime l /L <br />10,760 ­` <br />it BP trail s one outcrop, \ cut mining area esbliahed <br />projected line of e neta <br />exposure '� <br />..._ _ _ _ -- temporary jeep trail to In 1995 parallel to sloping <br />storm water flow replace old Jeep trail limestone formation <br />old pack trall <br />t � -. __- road to be graded into terrain -- .- ._._.- ---- -. - - <br />� <br />diversion structure \ - 70,840. _ - -__. -_ <br />contours, ripped, 9011 applied, - <br />1 <br />ADIT I / mulched and seeded p p <br />all can are dumps will be removed IYQt1TH <br />during mining process and will -- _.____ <br />/ storm water flow ADIT to be baekRllod with wears , \ <br />on Inside of road rock end reclaimed to surround,n either be processed or used as fill <br />' \ � � ion 1996 - 2004 1 <br />\ \ M contain depress 0'800 <br />_. terrain contours, 1986 ` <br />soil applied, mulched and seeded <br />ell old ore dumps will be removed <br />dither mining process and will ;, \\ 1 adjoning bite, <br />10.720 either t processed m used as 0 WJldli:e habitat <br />\ <br />In contour depression 1995 • 2004 <br />nto 2 <br />7 <br />are dumps removal started'---" . <br />In 1995, ore processed, wasted, <br />=Dolour 99 and 2 reclamation or moved to location of ADIT 2- patented mineral <br />area - ailed end 2000 U applied, ore_dl{mp__- . - _- " claim boundary line <br />arse graded, ripped. soil spelled, <br />\ . — <br />mulched and seeded \ - - 10, )80 <br />\ ` storm water structure to be reclaimed <br />contour depression roclemstion alarm water flow �+ <br />wan - 1997 and 1898 reclamation, on inside of road d <br />bee Waded, ripped, Ball applied, <br />mulched and seeded -_ - --_ -- - <br />10,640' <br />- -- - - <br />a <br />RECLAMATION PLAN <br />r[B 0 31995 <br />area, 1999 and 000 <br />contour depression fill <br />Durango Field Office <br />— - <br />SCALE 1 " = 50' <br />area, 1997 and 19{9,8 <br />IN <br />adjoining uses, . <br />habitat_ <br />storm water flow <br />wildlife <br />Containment structure <br />.l <br />NO-o <br />storm water structure to be left <br />HESPERUS, CO 81326 <br />10,600' <br />Mtact, surface will be ripped, soil <br />6/27/1994 Pe1mltNumber <br />��. <br />applied, mulched and seeded <br />-- . <br />Section/Exhibit <br />�OC/ �� ` - <br />Bab cC <br />� Class R;" <br />BOB HILL a'oRe�D`itilro�iGe�XL``�C,�_t° <br />- - - -- <br />ADIT 1 <br />-- -- - - -- <br />Bolls stockpile are, <br />___d _ En_ <br />OApplicatio (Coal oly) O O r-_me_nt _O _nsp_e__c_ti_o_n __________.______ <br />1995.2004 <br />_.._— 10,560' _ <br />- - <br />Bolls stock Ile will be removed <br />and <br />nto surrounding contours, ripped, <br />soil applied, mulched hid seeded j <br />storm water flow ~� - - -- - -_ - -- <br />diversion structure <br />road to be graded Into terrain <br />contours, ripped, soil <br />mulched end seeded - <br />�/ •k0 <br />all stormwater structures downsope <br />Of ADIT 10 will be constructed In 1996• <br />starmwater strctur,s upslope of ' <br />ADIT 10 will be built In 1996 and 1997 <br />P <br />applied to mine reclamation areas and <br />then the soils stockpile area will be - ADIT to be beckfllled with patented mineral <br />graded, ripped, mulched, and seeded waste rock and reclaimed to claim boundary line <br />sarrormding terrain contours <br />soil applied, mulched and seeded \ <br />San Juan Natioral Forest \ <br />BLM GPS survey marker <br />adjoining uses, <br />wildlife habitat <br />70 <br />�s00 <br />'0440, <br />Patented mineral <br />Claim boundary line <br />ELM GPS survey marker <br />70,720 <br />i <br />ADITS currently open - ADITS 1 4 2 <br />ADITS to be opened -- ADITS 10 L•. 13 <br />ADITS caved in -- ADITS 3, 4, 51 g, 7, <br />8,9,10,11,12, &13 <br />10,680• - <br />easements - none / <br />utilities - none <br />CLdverts - none <br />alistructures are proposed <br />BLM GI 'S survey marker <br />\ San Juan National Forest <br />EXHIBIT E <br />Receww <br />RECLAMATION PLAN <br />r[B 0 31995 <br />REVISED 1113/1994 <br />�m <br />Durango Field Office <br />SCALE 1 " = 50' <br />DWision of Minerals &Geology <br />IN <br />DEADWOOD GULCH MINERALS COMPANYo <br />IDGMC) <br />NO-o <br />PO BOX 96 <br />HESPERUS, CO 81326 <br />6/27/1994 Pe1mltNumber <br />Class: OPennd <br />Section/Exhibit <br />�OC/ �� ` - <br />Bab cC <br />� Class R;" <br />BOB HILL a'oRe�D`itilro�iGe�XL``�C,�_t° <br />� i <br />eelama7on__; <br />Doc Type: <br />___d _ En_ <br />OApplicatio (Coal oly) O O r-_me_nt _O _nsp_e__c_ti_o_n __________.______ <br />I • <br />