My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE34252
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE34252
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:44:18 PM
Creation date
11/21/2007 2:05:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981011
IBM Index Class Name
Enforcement
Doc Date
12/14/1989
Doc Name
EXTENSION PAST 90 DAYS FOR ABATEMENT FOR NOV C-89-031
From
MLRD
To
FRED BANTA MIKE LONG
Violation No.
CV1989031
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> <br />• <br />~ III IIIIIIIIIIIII III <br />STATE OF COLORADO <br />Roy Romer, Governor <br />~~ <br />DEPARTMENT OFNATURALRESOURCES <br />MINED LAND RECLAMATION DIVISION <br />FRED R. BANTA, Director <br />December 14, 1989 <br />T0: Fred Banta and Mike Long ~y <br />From: Mike Sae and David Berry <br />RE: Extension past 90 days for abatement for NOV C-89-031 <br />Based on David Berry's inspection of the Apex No. 2 Mine on November 11, 1989 <br />Notice of Violation C-89-031 was issued for failure to maintain the drainage <br />control system in accordance with the approved plan. Abatement step number 1 <br />was to, "Maintain the entire drainage control system so that all ditches and <br />culverts are clear of debris and so that all ditches are in compliance with <br />the dimensional requirements specified on Plate l." This was to be <br />accomplished by December 1, 1989. <br />On November 27, 1989 Mike Savage visited the site to check on progress of the <br />abatement. The operator had built up the berms to conform to the design <br />criteria. However, the culverts of concern had not been uncovered and <br />cleared. Ther had been a recent snowfall of approximately 8-10 inches. The <br />operator had contacted David Berry that week to inform him that the culverts <br />could not be located. The operator felt they had been deeply covered by <br />county road maintenance operations. Further, the operator stated that weather <br />conditions (primarily frost and snow depth) were preventing them from <br />completing that portion of the abatement. The operator requested in writing <br />that the deadline be extended. The on-site conditions were verified by David <br />Berry during an inspection conducted December 6, 1989. <br />At this time we would request concurrence of the Administator in accordance <br />with Rule 5.03.2(2)(e) for the extension of the abatement deadline to March 1, <br />1989. We feel that this is the shortest possible time required to abate this <br />step, and that sufficient interim measures have been completed to minimize <br />harm to the public or the environment. <br />2209E <br />215 Centennial Building, 1313 Sherman Street Denver, Colorado 80203-2273 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.