Laserfiche WebLink
V <br />0 <br />- N- <br />� <br />- - <br />J <br />Bl- <br />«13 <br />B - <br />11.9 acres <br />B1 -1 <br />5.6 acres <br />v Cues <br />Pit A <br />' <br />/1 <br />---Not in <br />ded/ <br />`- <br />- - _ <br />and S -11 <br />-- -- 5. <br />1.9 <br />Pond SP- Via/ <br />2.5 a -' <br />Pond <br />' <br />utnp <br />- - - <br />s , <br />and SP -7 <br />/ <br />1 <br />'hr <br />1 a <br />1 I <br />25.7 re <br />\ <br />I <br />I <br />� <br />All J I t � <br />o <br />e I <br />g <br />\\ <br />I <br />it <br />E <br />I <br />r <br />j <br />.nacres <br />/ <br />4 <br />19632 <br />a z aou Fon <br />TM <br />r PACES PEAK MINING CO. <br />«e�ti.d e <br />" ° <br />° "` <br />AREQUA DRAINAGE PLAN <br />CONFIGURATION 3 - 4th QTR 1997 <br />Note: <br />Diversion channel G -H to be completed during initial phases of configuration 3 <br />Diversion channel A -B to be terminated upslope of pond SP -2 upon completion of channel G -H <br /><. 04 -01 -96 1 1' =200' 1 a 3.dw w <br />