My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-12-01_REVISION - M1999025
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999025
>
2005-12-01_REVISION - M1999025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:27 PM
Creation date
11/21/2007 2:04:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999025
IBM Index Class Name
Revision
Doc Date
12/1/2005
Doc Name
Approval and Reclamation Cost Estimate Recalculation
From
DMG
To
Grand Junction Pipe and Supply Company
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 05a <br />Date : 11/30/2005 <br />User: SSS <br />State :Colorado <br />County :Mesa <br />Site :Soaring Eagle Gravel Pit <br />Agency or organization name :DMG <br />Permit or other job action : TR-02 Reclamation Cost Estimate Recalculation <br />Task description :Excavate OUt/et structure <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :BOPS Cab <br />Attachment no. 2 :3-shank ripper <br /> tItIIlZatlOn <br />Ownership cosUhour : $51.01 NA <br />OperatingcosUhour : $97.64 100 <br />Ripper op.cosUhour : $0.98 10 <br />Operator cost hour : $31.78 NA <br />Total unit cosUhour : $181.40 Total fleet cosUhour <br />MATERIAL QUANTITIES <br />Initial <br />volume: 2,555 BCY <br />Swell Loose <br />factor: 1.180 volume <br />Source of estimated volume :See out/et detai/s in <br />Source of estimated swell factor :CAT Handbook <br />Horsepower: 405 <br />Shift basis : 1 per day <br />3,015 <br />$181.40 <br />LCY <br />Source <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production : 2,110.5 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 0.00 % (F <br />Average site altitude : 4,490 feet <br />Material weight <br />Weight description <br />Clay and gravel -Dry <br />2,400 Ibs/LCY <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.60 <br />Push gradient : 1.00 <br />Attitude : 1.00 <br />Material weight : 0.96 <br />Blade type : 1.00 <br />Nel correction : 0.32 <br />Adjusted unit production <br />Adjusted fleet production <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time <br />Unit cost : $0.267 /LCY Total job cost <br />Permitfjob# : M-1999-025 <br />Abbreviation :none <br />Filename : M025-05a <br />679.64 LCY/hr <br />679.64 LCY/hr <br />4.44 Hours <br />$805 <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.