Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name :DMG <br />Task # : 12a State :Colorado PermiUjob # : M-1999-025 <br />Date : 11/30/2005 County :Mesa Abbreviation :none <br />User : SSS Site :Soaring Eagle Gravel Pit Filename :M025-i2a <br />Permit or other job action : Tr-02 Reclamation Cost Estimate Recalculation <br />Task description : Tr'arlSpO/'f /eClamBt%On @C]U%plflent f0/fr0171 S%te <br />EQUIPMENT TRANSPORT RIG COST Shift basis : i per day <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cosUhour : $23.32 $25.78 $31.45 <br />Operating cosUhour : $30.29 $31.74 $35.14 <br />Operator cosUhour : $27.40 $27.40 $27.40 <br />Helper cosUhour : $0.00 $25.15 $25.15 <br />Total Unit Cost/hour : $81.01 $110.07 $119.13 <br />rn~ uo.~cur <br />Machine <br />Description WeighVunit <br />(Tons) Ownership <br />CosUhr/unit Haul Rig <br />CosUhr/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/fleet Return Trip <br />CosUhrtfleet DOT permit <br />CosUfleet <br />-Cat D9R - 9SU 66.73 $51.01 $119.13 1 $170.14 $119.13 $0.00 <br />-Cat 320C 21.71 $26.04 $81.01 1 $107.05 $81.01 $0.00 <br />-Cat 633E Series 2 56.34 $64.24 $119.13 1 $183.37 $119.13 $0.00 <br />-Revegetation equip. 20.00 $20.00 $81.01 2 $202.02 $162.02 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $662.58 $481.29 $0.00 <br />sheet 1 of 2 <br />