My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE34178
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE34178
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:44:16 PM
Creation date
11/21/2007 2:03:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Enforcement
Doc Date
6/20/1997
Doc Name
NOV
Violation No.
CV1997007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEPS NECESSARY TO ABATE VIOLATION (continued) <br />2. <br />a. Clean out sediment from north end of Moffat Pond and the outlets of North Diversion Ditch <br />and Final Moffat Drainage Channel; <br />b. repair rip rap and liner in Final Moffat Channel; <br />c. spray thistle that has grown up on sediment deposited in undisturbed areas affected by Moffat <br />Pond short-circuit; <br />d. seed the gullies in undisturbed area but do not regrade or further disturb the native vegetation. <br />3. <br />a. Repair erosion damage (gullies) within reclaimed portions of Moffat Area; <br />b. spray thistle that has grown up on sediment deposited in undisturbed areas from erosion of <br />reclaimed azea; <br />c. seed the gullies in undisturbed azea but do not regrade or further disturb the native <br />vegetation. <br />d. submit a revision for upgrading the drainage in the Moffat Area to prevent further gully <br />development until vegetation becomes established. <br />4. Clean sediment out of Tipple Ponds 1 & 2 and perform other maintenance necessary to assure <br />proper functioning of ponds. <br />
The URL can be used to link to this page
Your browser does not support the video tag.