Laserfiche WebLink
-3- <br />SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No.: C-97.007 <br />NATURE OF VIOLATION: <br />Failure to preven[ contributions of suspended solids to streamFlow or runoff onside the permit area Failure to pass disturbed area runoff <br />Ihroueh a sediment pond: failure to ensure [hat the cons[ruclion maintenance and pos[-minine condition of access roads w111 control or <br />prevent erosion and siltation: failure to clean ou[ [emoorarv or laree settlingponds from drainage after disturbed areas are reveeetated and <br />stabilized: failure to stabilize and protect all surface areas affected by the surface minine of coal and reclamation operations to effectively <br />control erosion: failure to minimize disturbances to the prevailing hydroloeic balance. <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />ACT CRS34-33-120(2)(j)(II)(A); CRS34-33-120(2)(q); CRS34-33-120(2)(j)(lll); <br />SECTION(S) CRS 34-33-120(z)(d): CRS 34-33-120(2)(1) <br />REGULATION 4.03.2 (1)(a); 4.03.2 (1)(b); 4.03.2 (6)(b); 4.03.2 (4)(a)(iii); 4.05.1 (1); 4.05.2 (l); <br />SECTION(S) 4.05.6 (9): 4.05.6 (3)(a): 4.05.6 (3~(b): 4.05.5 <br />PERMIT 3.5.4; 3.5.5; 4.6.1.5; 4.6.5.3; 4.6.7. <br />SECTION(S) <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br />West idge road. "Super Curve" area: North end of Moffat Pond: Moffat Area reclamation: <br />mole Ponds 1 and 2. <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />la. Devise and install drainage system to alleviate erosion on "supercurve"area by instlling a temporary <br />ditch to transport all drainage water from the road ditches to the ditch on south side of road: <br />b. Permanent measures should be taken through submission of a permit revision to assure all road <br />drainage is effectively controlled. <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE <br />19 <br />la. 27 June 1997 b. Submit complete application for revision by 10 July 1997: implement approved plan by 18 Sep 97. <br />2a. b. 18 July 1997: c. 1 I July 1997: d. 18 September 1997. <br />3 a.18 July 1997: b. 11 July 1997: c. 18 September 1997: d. Submit complete application for revision by 10 July 1997; <br />implement approved plan by 18 Sep 97. <br />0221E (3/95) <br />WHITE -File YELLOW -Operator PINK -Specialist <br />