Laserfiche WebLink
Stipulation No. 29 <br /> The operator shall continue to submit to the Division an annual report of <br /> inflows, discharges , and consumption of water within the mine. This <br /> report is to include a mine workings map showing the location and quantity <br /> of inflows ; a table keyed to the mine map which shall contain the source <br /> (i .e. fault, fractures , etc. ) , quantity, duration and quality ( i .e. pH, <br /> electro-conductivity and temperature) of all measurable inflows ; a table <br /> containing records of water imported for use within the mine; a discussion <br /> of the water balance within the mine; and finally, a projection of <br /> hydrologic impacts of mining in the upcoming year. The mine inflow study <br /> shall be conducted during the month of June. If the occurrence of inflows <br /> becomes significantly greater than the anticipated rates , the Division may <br /> require that an additional inflow study be conducted at another time <br /> during the year. <br /> Resolved: The commitment to annual mine inflow monitoring and reporting <br /> is found in Volume 5A of the permit document. <br /> Stipulation No. 30 <br /> CWI shall continue to maintain rain gage and evaporation pan monitoring at <br /> or near the WEI wellfield. The rain gage shall record daily and the <br /> evaporation monitor shall record evaporation monthly when not frozen. <br /> Resolution: COVCC is presently putting together a hydrologic budget which <br /> will satisfy the conditions set forth in Section 2.04.80 )(b) and (c) that <br /> prompted the origination of this stipulation. <br /> Stipulation No. 31 <br /> CWI shall submit a plan to monitor water quantity changes as a result of <br /> changing the overland ditch point of diversion to West Roatcap Creek <br /> within 30 days of permit issuance. <br /> Resolved: CWI submitted this plan September 29, 1988, and MLRD approved <br /> the plan October 28, 1988. <br /> Stipulation No. 32 <br /> The operator shall monitor one alluvial well identified as Node 22 or 87. <br /> Water levels , pH, electro-conductivity and temperature in this well must <br /> be monitored monthly, as weather permits , and water quality samples shall <br /> be drawn quarterly for the parameters listed in Appendix A. <br /> Resolved: CWI committed to monitoring the Node 22 (B-7) well in <br /> Section 2.05.6(3)(b)( iii ) of the permit document. <br /> Stipulation No. 33 <br /> Ventilation shaft construction activities will be performed prior to <br /> June 1 , 1988, or following June 15, 1988, to reduce disruption during the <br /> fawning period. <br /> Ongoing. <br /> -19- <br />