Laserfiche WebLink
IY, Enfiorcement Actions <br />The fiollowing identifies enforcement actions taken during this inspection, the <br />required abatement and date of abatement for the violation, previous violations <br />still requiring abatement and the termination of violations cited during previous <br />inspections. <br />NOV C-91-005 was issued for the operators failure to conduct <br />mulching and seeding operations of the topsoiled areas during the <br />first normal period for favorable planting as required in Rule <br />4.15.3(1). <br />STEPS NECESSARY TO ABATE VIOLATION: The operator shall commit to <br />mulching and seeding the recently topsoiled areas before December <br />15, 1991 but no sooner than October 1, 1991. <br />TIME FOR ABATEMENT: The operator shall submit this commitment to <br />the Division no later than July 19, 1991. <br />NOV C-91-006 was issued for the operators failure to demonstrate <br />in a request for a small area exemption that the runoff from the <br />disturbed area would meet effluent limitations as required in <br />Rule 4.05.2(3)(a). <br />STEPS NECESSARY TO ABATE: The operator shall submit designs for a <br />small area exemption that contain a demonstration that the runoff <br />from the SAE will meet effluent standards. <br />TIME FOR ABATEMENT: The operator shall submit the designs for the <br />Division's review no later than July 19, 1991. <br />NOTE: Attach appropriate VIOLATIONS OR CESSATION ORDER CODING FORMS <br />Reviseo: 4/88 <br />Doc. No. 8101E <br />