My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-02-05_REVISION - M1984001
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984001
>
2001-02-05_REVISION - M1984001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2021 10:20:20 PM
Creation date
11/21/2007 2:00:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984001
IBM Index Class Name
Revision
Doc Date
2/5/2001
Doc Name
RECEIPT
From
DMG
To
J&M SCHMAHL
Type & Sequence
TR1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT: CLIENT/ON SITE REP: <br /> Unaweep Quarry Geotechnical N /A <br /> �' Engineering <br /> Group, Inc. CONTRACTOR/REP: <br /> TASK. Embankment Fill N /A <br /> PROJECT NO DATE: Geotechnical, Environmental <br /> : <br /> and Materials Testing Consultants TECHNICIAN: HOURS: <br /> 593 12/13/00 Greg Poetigen <br /> DAILY COMPACTION REPORT <br /> TEST TYPE MAX.DRY OPTIMUM DRY MOISTURE NOT <br /> TEST LOCATION ELEV. DENSITY MOISTURE DENSITY CONTENT PERCENT WITHIN SOIL FIGURE <br /> NO. NUC SANG (pcf) CONT.I%) (per) (%) COMPACTION SPEC. TYPE NUMBER <br /> ' <br /> 1 Test pit,TP-1 3 X 133.0 8.5 109.9 6.2 82.6 GM 7 <br /> 2 Test pit, TP-1 6 X 133.0 8.5 116.2 7.1 87.4 GM 7 <br /> 3 Test pit, TP-2 0 X 133.0 8.5 119.2 6.5 89.6 GM 7 <br /> 4 Test pit, TP-2 4 X 133.0 8.5 107.5 4.7 80.8 GM 7 <br /> 5 Test pit,TP-3 3 X 133.0 8.5 122.4 3.7 92.0 GM 7 <br /> 6 Test pit, TP-3 6 X 133.0 8.5 118.7 4.5 89.3 GM 7 <br /> 7 Test pit,TP-3 0 X 133.0 8.5 126.2 6.1 94.9 GM 7 <br /> `Indicates depth(feet)below test pit surface. <br /> MOISTURE!DENSITY SPECIFICATIONS OBSERVATION/TESTING FIELD OBSERVATIONS <br /> SPECIFIED Cohesive Soils Full Time: Weather Conditions: Compaction Equipment Used: <br /> COMPACTION --- % MDD <br /> REQUIREMENT: Cohesionless Soils Part Time: Wind: None MPH <br /> SPECIFIED Cohesive Soils Number of Site Visits/Day: Temperature: 35 =F Sheepsloot: <br /> MOISTURE +/- --- % OMC Precipitation: None Smooth Drum Roller: <br /> REQUIREMENT: Cohesionless Soils Testing Only: <br /> LABORATORY Cohesive Soils Ira Ory: <br /> IN ""PROCEDURES Cohesionless Soils Other(List Below1 Informed(Rep.Of Company)of Test Results' : <br /> DENSITY/COMPACTION TESTING WAS NOT PERFORMED ON THIS Insufficient amount of <br /> N /A Unknown <br /> DATE FOR THE FOLLOWING REASONS: Material placed GEG was not informed <br /> prior to our arrival on <br /> Contractor Not Working Due To: The Contractor is: Field Copy Given To: site that the contractor <br /> would not working ❑ <br /> Inclement Weather Processing Frozen Material Processing Wet Material on this dale.e. <br /> Equipment Malfunction Stripping and/or Grubbing Site Moisture Conditioning Dry Material N /A <br /> Unknown Stockpiling Fill Removing Unsuitable Material <br /> Fig. No. 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.