My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE34019
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE34019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:44:11 PM
Creation date
11/21/2007 1:59:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984026
IBM Index Class Name
Enforcement
Doc Date
11/13/1997
Doc Name
UNPERMITTED CONSTRUCTION MATERIAL EXTRACTION OR EXPLORATION OPERATION PRESENTATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DURATION OF THE VIOLA~N(S) • <br />(The staff shall describe if the claimed violation(s) is actively occurring, and for ho long. Also describe <br />corrective actions in progress, or completed by the operator.) <br />The claimed violation was discovered on November 13, 1997 while conductin a warranty reduction <br />inspection requested by the operator. The increased financial warranty to cove reclamation costs for <br />this area of disturbance was approved by the Division on January 12, 19 8. The operator has <br />indicated that they are in the process of compiling a 112(c) application that w II incorporate the area <br />of violation into an approved permit area. <br />The Board may determine the duration of the violation by considering any of the foll wing: <br />1. The date of the inspection that identified the potential violation(s), <br />2. When the corrective action is completed, <br />3. When did or will the activity that caused the violation(s) cease, <br />4. The date the Board ordered corrective actions will be or are completed <br />5. The date the Board ordered corrective actions begin, <br />6. Any other relevant evidence. <br />BOARD JUSTIFICATION FOR DURATION (To be completed by the Board) <br />1. The inspection date that identified the potential violation(s) <br />2. The date the operator completed the corrective action <br />3. The date the activity that caused the violation(s) ceased <br />4. The date the ordered corrective actions will be or are completed <br />5. The date the Board ordered corrective actions shall begin <br />6. Any other relevant evidence. <br />BOARD JUSTIFICATION FOR THE AMOUNT OF THE CIVIL PENALT <br />SUSPENSIONS. 'The Board may suspend portions of a civil penalty if it will assist <br />of the Act through compliance and reclamation. ITo be comp/eted by the Board) <br />BOARD ORDERED CORRECTIVE ACTIONS: <br />1. Staff recommendations. <br />2. Staff re11commendation(s) with the following modification) <br />Y55u.~ Q Cr/i~ ~~Ra~l'y o~ ~/~(~ 333.oc Qn~- $uS~ <br />7~ C%C>C' C p p u(^ ~ ~2 -L p 1' /1 a 1 {`~ <br />Chair -Mined Land Reclamation Board <br />~GiC -~ <br />Date: .~_.,._ ~ ~ 19~~_ <br />4 <br />AND POSSIBLE <br />furthering the goals <br />~n ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.