<br />•. <br />MS. CAROL PAFII.1~ <br />Page 4 <br />October 10, 1980 <br />reclamation work. This work will involve removing any structures and then <br />rerroving the top two (2) feet of overburden material. This material will <br />be hauled to the pit and buried under four (4) feet of non-toxic cover. <br />The azea then will be ripped to a depth of two (2) feet and topsoil re- <br />distributed. The area will be revegetated using the same seed mixture <br />that will be approved for the active mining. The reclamation work for <br />these areas will be initiated upon termination of mining. <br />5) Pclditional I~brk Being Initiated - Mr. Robert Thompson of CPL <br />Than~son has been contracted to do a stability and overburden swell <br />study. The swell information canbined with the geologic data and <br />accurate mapping will be used to generate meaningful overburden volumes. <br />Once these volumes are obtained, TBM will be able to derronstrate that <br />they can meet the AOC requirements. <br />TBM has proceeded in good faith to obtain the information needed to <br />finalize a sound mining and reclamation plan. At this time all the <br />information is not available and TBM would request that the information <br />put forth in this report be sufficient to satisfy the abatement conditions <br />required in NOV 80-27 and 80-28. TBM will supply the additional information <br />required by the NOV's in its permanent program sukmission. <br />if you have any questions concerning the above, please contact me <br />at your convenience. <br />Sincerely, <br />~~~~ <br />RICHARD MILLS <br />Senior Ehvirornnental Coordinator <br />RM/cs <br />ESiclosures <br />cc: Mr. Jirmiy Renfro <br />cc: Mr. Mike McCarthy <br />