My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE33952
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE33952
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:44:09 PM
Creation date
11/21/2007 1:58:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Enforcement
Doc Date
7/11/1997
Doc Name
YOAST MINE C-94-082 NOV C-97-004
From
SENECA COAL CO
To
DMG
Violation No.
CV1997004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III i i III 11111111111 ~ <br /> <br />E~~A <br />S Coal Company Seneca Coal Company <br />July 10, 1997 <br />Mr. Jim Burnell RECEIVED <br />Division of Minerals and Geology <br />1313 Sherman street, Room 215 JUL 11 1997 <br />Denver, CO 80203-2273 <br />RE: Yoast Mine Permit C-94-082, NOV C-97-004 Divisionolm~ne~e~b.~..o~~~y/ <br />Dear Mr. Burnell: <br />This correspondence is a request for an extension of time for the <br />abatement of NOV C-97-004 to the Yoast Mine Permit C-94-082. The <br />current abatement deadline for this NOV is Thursday, July 17th, <br />Step 1 of this NOV required Seneca to remove all sloughed fill <br />material from the channel of Annand Draw near culvert YB-6. The <br />fill has been removed from the channel, the road slopes reshaped <br />and the silt fence at the toe of each slope has been installed, <br />therefore this portion of the abatement has been completed. Step <br />2 of the abatement required us to grade the fill material located <br />adjacent to RCR 27 to the final 5:1 slope proposed in TR-05. The <br />slope has been graded and the final drainage ditch established. <br />We still need to place the erosion control matting in the <br />drainage to finish this portion of the abatement. Finally, step 3 <br />of the NOV was to complete the construction of the relief drains <br />on Yoast Haul Road A per the designs in the permit. We have just <br />initiated the work on these downdrains. I am asking for a 15-day <br />extension of the current deadline to August 1st. <br />Should you or any other members of the Division have any <br />questions regarding this information, please do not hesitate to <br />contact me. <br />Sincerely, <br />~W. ~2.- <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />c: Gary Wendt (PWCC) <br />Seneca Caal Company • P.O. Drawer D • Hayden, Colorado 61639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.