My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-06-30_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
1999-06-30_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:28:19 PM
Creation date
11/21/2007 1:57:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
6/30/1999
Doc Name
Technical Revision TR-08 application
From
CLIMAX MOLYBDENUM CO
To
DMG
Type & Sequence
TR8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Figure 2a shows Intensity-Duration-Frequency (IDF) curves for the mine site <br /> area that can be used to determine runoff from any of the three sub-basins using <br /> the Rational Method. Two curves are provided, one for annual series (all <br /> seasons) and a second for partial duration series (May through October). <br /> Figure 2b presents the NOAA data and calculations used to develop the IDF <br /> curves. <br /> Figure 2c through 2e present the Rational Method calculations of peak discharge <br /> and runoff volume for each sub-basin and for return periods of 2 through 100 <br /> year storm events. The calculated time of concentration for each sub-basin is <br /> about 5 minutes of less. Therefore the intensity values from Figure 2a for 5 <br /> minutes were used. <br /> • <br /> • p�q�r <br /> 10 <br /> Ana 23.M9 <br /> TR d= <br />
The URL can be used to link to this page
Your browser does not support the video tag.