My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE33935
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE33935
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:44:09 PM
Creation date
11/21/2007 1:57:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Enforcement
Doc Date
6/22/1995
Doc Name
SENECA II-W MINE PN C-82-057 SETTLEMENT AGREEMENTS NOVS C-95-006 C-95-007 & C-95-008
From
DMG
To
SENECA COAL CO
Violation No.
CV1995007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />1313 Sherman 61., Room 215 <br />Denver, Colorado 80203 <br />Phone: 1303) 866-7567 <br />FA%: 13031 832-8106 <br />DATE: June 7, 1995 <br />I~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />/ Roy Rompr <br />TO: Sandy Brown, Assessment Officer c°"""°' <br />lames S Lochhead <br />/ Executive Dirxlor <br />FROM: Wally Erickson WG M¢hael B Long <br />Division Dueclor <br />RE: SUMMARY NOV C-95-007, <br />Seneca Coal Company, Seneca II W, Permit No. C-82-057. <br />3/31/95 Issued during OSM-AFO oversite, for haul road drainage contributing <br />additional suspended solids to streamflow or to runoff outside the permit <br />area and for failure to minimize erosion and siltation associated with haul <br />road drainage structures. <br />4/5/95 Modified to include Mine Entrance Road Culvert 5, ME-5. <br />4/7/95 Modified to include sections of Act, Rules, and permit that were violated. <br />4/20/95 Abatement deadline originally set at 4/15/95 extended to 5/5/95. <br />4/20/95 Abatement deadline originally set at 4/20/95 extended to 5/5/95. <br />5/3/95 Wet field conditions persist, additional extension request and extension on <br />original TR submittal deadline of 4/30/95. <br />5/4/95 TR requirement modified, TR need not address TAHRC-1, TAHRD-7, <br />and HRD-Al, TR is required for ME-5 and G-2. <br />5/4/95 Civil Penalty Assessed <br />5/19/95 Request for assessment conference received, request dated 5/16/95. <br />5/22/95 Abatement deadline for sediment excavation and disposal from ME-5 and <br />G-2 extended to 6/2/95, TR submittal deadline extended to 6/9/95. <br />6/6/95 Assessment Conference. Abatement deadline for sediment excavation and <br />disposal from ME-5 and G-2 extended, due to muddy field conditions, to <br />6/16/95, extension request received by FAX 6/2/95. <br />
The URL can be used to link to this page
Your browser does not support the video tag.